Scenario-Planning Method for Cost Estimation Using Morphological Analysis
Early cost estimates are emphasized repeatedly in the initial decision-making process to set a direction for the success of construction projects. Therefore, alternatives need to be examined, and the consequences for the cost should be analyzed carefully. This study proposes a scenario-planning meth...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/4962653 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Early cost estimates are emphasized repeatedly in the initial decision-making process to set a direction for the success of construction projects. Therefore, alternatives need to be examined, and the consequences for the cost should be analyzed carefully. This study proposes a scenario-planning method that uses morphological analysis for the estimation of construction cost. A case study was conducted using public data on 102 apartment buildings from 10 housing complex projects. The results show estimation accuracy of 4.23 to 4.86% and an average stability enhancement of 1.39 to 1.73%. The proposed process can produce adaptable scenarios and evaluate the impact of the scenarios in a complicated decision-making process with limited information provided. Furthermore, this method can provide a contingency plan to cushion against uncertainties. |
---|---|
ISSN: | 1687-8086 1687-8094 |