Minimum delay algorithm based on time aggregated graph in DTN network

The DTN network has the characteristics of dynamic topology change,thus the routing algorithm of static network can not solve the routing problem of time-varying network,and can not support fast transmission of given tasks.The existing time-variant routing algorithm CGR (contact graph routing) uses...

Full description

Saved in:
Bibliographic Details
Main Authors: Peng WANG, Hong-yan LI, Tao ZHANG, Peng-yun LI
Format: Article
Language:zho
Published: Editorial Department of Journal on Communications 2017-10-01
Series:Tongxin xuebao
Subjects:
Online Access:http://www.joconline.com.cn/zh/article/doi/10.11959/j.issn.1000-436x.2017228/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841539491229073408
author Peng WANG
Hong-yan LI
Tao ZHANG
Peng-yun LI
author_facet Peng WANG
Hong-yan LI
Tao ZHANG
Peng-yun LI
author_sort Peng WANG
collection DOAJ
description The DTN network has the characteristics of dynamic topology change,thus the routing algorithm of static network can not solve the routing problem of time-varying network,and can not support fast transmission of given tasks.The existing time-variant routing algorithm CGR (contact graph routing) uses the earliest contact to obtain the shortest path,but because of the influence of the order of the connectivity period,the CGR algorithm has low link utilization.To solve this problem,the method of finding the shortest path was proposed.Besides,in order to characterize the relation between the different connect periods of the same link,the time series of node cache was added to the time aggregated graph.Based on this,the end-to-end multi-path shortest delay routing algorithm for the known task requirements was proposed.Finally,the feasibility of the algorithm was proved by an example.
format Article
id doaj-art-31ff838d3d2b455899362e65249a1505
institution Kabale University
issn 1000-436X
language zho
publishDate 2017-10-01
publisher Editorial Department of Journal on Communications
record_format Article
series Tongxin xuebao
spelling doaj-art-31ff838d3d2b455899362e65249a15052025-01-14T07:13:34ZzhoEditorial Department of Journal on CommunicationsTongxin xuebao1000-436X2017-10-01381859714313Minimum delay algorithm based on time aggregated graph in DTN networkPeng WANGHong-yan LITao ZHANGPeng-yun LIThe DTN network has the characteristics of dynamic topology change,thus the routing algorithm of static network can not solve the routing problem of time-varying network,and can not support fast transmission of given tasks.The existing time-variant routing algorithm CGR (contact graph routing) uses the earliest contact to obtain the shortest path,but because of the influence of the order of the connectivity period,the CGR algorithm has low link utilization.To solve this problem,the method of finding the shortest path was proposed.Besides,in order to characterize the relation between the different connect periods of the same link,the time series of node cache was added to the time aggregated graph.Based on this,the end-to-end multi-path shortest delay routing algorithm for the known task requirements was proposed.Finally,the feasibility of the algorithm was proved by an example.http://www.joconline.com.cn/zh/article/doi/10.11959/j.issn.1000-436x.2017228/DTN networktime aggregated graphoptimal pathCGR algorithm
spellingShingle Peng WANG
Hong-yan LI
Tao ZHANG
Peng-yun LI
Minimum delay algorithm based on time aggregated graph in DTN network
Tongxin xuebao
DTN network
time aggregated graph
optimal path
CGR algorithm
title Minimum delay algorithm based on time aggregated graph in DTN network
title_full Minimum delay algorithm based on time aggregated graph in DTN network
title_fullStr Minimum delay algorithm based on time aggregated graph in DTN network
title_full_unstemmed Minimum delay algorithm based on time aggregated graph in DTN network
title_short Minimum delay algorithm based on time aggregated graph in DTN network
title_sort minimum delay algorithm based on time aggregated graph in dtn network
topic DTN network
time aggregated graph
optimal path
CGR algorithm
url http://www.joconline.com.cn/zh/article/doi/10.11959/j.issn.1000-436x.2017228/
work_keys_str_mv AT pengwang minimumdelayalgorithmbasedontimeaggregatedgraphindtnnetwork
AT hongyanli minimumdelayalgorithmbasedontimeaggregatedgraphindtnnetwork
AT taozhang minimumdelayalgorithmbasedontimeaggregatedgraphindtnnetwork
AT pengyunli minimumdelayalgorithmbasedontimeaggregatedgraphindtnnetwork