Finite Element Analysis of Vertical and Horizontal Drainage Structures under Vacuum Combined Surcharge Preloading
Combined vacuum and surcharge preloading has gradually been widely used because of its advantages of low cost, green environmental protection, and good treatment effect. The conventional prefabricated vertical drain presents obvious defects in vacuum preloading treatment, such as obvious silting, se...
Saved in:
| Main Authors: | Daqing Wang, Dong Wei, Guoyi Lin, Jiannan Zheng, Zhiting Tang, Litao Fan, Bingxiang Yuan |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2021-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2021/9448436 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Experimental Study on Dewatering of Hydraulic Silts by Horizontal Electroosmosis Combined with Surcharge Preloading
by: YANG Yang, et al.
Published: (2021-01-01) -
Experimental study on the consolidation characteristics of soilbags-reinforced soft soil foundation with surcharge preloading
by: Jie Liao, et al.
Published: (2025-07-01) -
Study on drainage mechanism of complete path for vacuum preloading based on thermodynamics theory
by: Fu Chen, et al.
Published: (2024-12-01) -
Ultrasoft Ground Treatment of Vacuum Preloading Combined with Calcium-Based Flocculants
by: Jin-Kai Yan, et al.
Published: (2020-01-01) -
Preliminary Study on Characteristics of Dredged Sludge Treated by Vacuum Preloading Using Non-filter Membrane Straw Drainage Bodies
by: XU Gui-zhong, JIANG Ao, LI Xing-bing, LIU Chao, FU Xiao-jie
Published: (2025-08-01)