Development of enhanced PRA model for Shimane Unit 2 internal event at-power for reflecting new findings including current plant states

After the Fukushima Daiichi nuclear power plants accident, the scope of Probabilistic Risk Assessment (PRA) application was enhanced to meet the new Japanese regulatory standard for nuclear power plants. In addition to that, an importance for risk management has come to be re-recognized in Japan. To...

Full description

Saved in:
Bibliographic Details
Main Authors: Takahiro USUI, Hiroki NAKAMURA, Kenichi IHARA, Hitoshi NOJIMA, Kenichi KANDA, Kazunobu NORIYASU, Daichi SHIOTA, Naoki HIROKAWA
Format: Article
Language:English
Published: The Japan Society of Mechanical Engineers 2025-04-01
Series:Mechanical Engineering Journal
Subjects:
Online Access:https://www.jstage.jst.go.jp/article/mej/12/4/12_24-00439/_pdf/-char/en
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850245067619434496
author Takahiro USUI
Hiroki NAKAMURA
Kenichi IHARA
Hitoshi NOJIMA
Kenichi KANDA
Kazunobu NORIYASU
Daichi SHIOTA
Naoki HIROKAWA
author_facet Takahiro USUI
Hiroki NAKAMURA
Kenichi IHARA
Hitoshi NOJIMA
Kenichi KANDA
Kazunobu NORIYASU
Daichi SHIOTA
Naoki HIROKAWA
author_sort Takahiro USUI
collection DOAJ
description After the Fukushima Daiichi nuclear power plants accident, the scope of Probabilistic Risk Assessment (PRA) application was enhanced to meet the new Japanese regulatory standard for nuclear power plants. In addition to that, an importance for risk management has come to be re-recognized in Japan. To use PRA in risk management, Japanese utilities are proceeding the projects for enhancing the quality of PRA model to comply with international standards. The Chugoku Electric Power Company is also upgrading the internal event at power PRA model of the Shimane Unit 2 Nuclear Power Plant (Boiling Water Reactor (BWR)) including both the level 1 and level 2 (except the source term analysis) and enhancing PRA quality to reflect international state-of-the-practice approaches and to meet (ASME/ANS, 2013) requirements (Capability Category II (CC-II) or higher). Our PRA upgrading process is divided into 3 phases: “Phase I”, “Phase II” and “As-is”. In the Phase I and Phase II, the PRA model was upgraded. An external expert review was conducted using (NEI, 2019) and (ASME/ANS, 2013) in the end of Phase II. In the As-is Phase, Shimane Unit 2 PRA is further being updated and upgraded. PRA was updated to reflect the as-built and as-operated plant features resulted from changes made to the plant design and procedure by licensing activities which were performed in parallel with PRA enhancement in the Phase I and Phase II. In addition, we updated the component failure data newly issued for Japanese nuclear power plant and reflected the findings on PRA for other Japanese plant. We addressed Facts and Observations (F&Os) raised in the external expert review conducted in the Phase II. This paper reports the processes and the details of improvements of the internal event at-power PRA for Shimane Unit 2 implemented in the As-is Phase.
format Article
id doaj-art-2fad5d3000824edc8e70622d9054ca2f
institution OA Journals
issn 2187-9745
language English
publishDate 2025-04-01
publisher The Japan Society of Mechanical Engineers
record_format Article
series Mechanical Engineering Journal
spelling doaj-art-2fad5d3000824edc8e70622d9054ca2f2025-08-20T01:59:34ZengThe Japan Society of Mechanical EngineersMechanical Engineering Journal2187-97452025-04-0112424-0043924-0043910.1299/mej.24-00439mejDevelopment of enhanced PRA model for Shimane Unit 2 internal event at-power for reflecting new findings including current plant statesTakahiro USUI0Hiroki NAKAMURA1Kenichi IHARA2Hitoshi NOJIMA3Kenichi KANDA4Kazunobu NORIYASU5Daichi SHIOTA6Naoki HIROKAWA7The Chugoku Electric Power Co., Inc.The Chugoku Electric Power Co., Inc.The Chugoku Electric Power Co., Inc.The Chugoku Electric Power Co., Inc.The Chugoku Electric Power Co., Inc.The Chugoku Electric Power Co., Inc.Hitachi-GE Nuclear Energy, Ltd.Hitachi-GE Nuclear Energy, Ltd.After the Fukushima Daiichi nuclear power plants accident, the scope of Probabilistic Risk Assessment (PRA) application was enhanced to meet the new Japanese regulatory standard for nuclear power plants. In addition to that, an importance for risk management has come to be re-recognized in Japan. To use PRA in risk management, Japanese utilities are proceeding the projects for enhancing the quality of PRA model to comply with international standards. The Chugoku Electric Power Company is also upgrading the internal event at power PRA model of the Shimane Unit 2 Nuclear Power Plant (Boiling Water Reactor (BWR)) including both the level 1 and level 2 (except the source term analysis) and enhancing PRA quality to reflect international state-of-the-practice approaches and to meet (ASME/ANS, 2013) requirements (Capability Category II (CC-II) or higher). Our PRA upgrading process is divided into 3 phases: “Phase I”, “Phase II” and “As-is”. In the Phase I and Phase II, the PRA model was upgraded. An external expert review was conducted using (NEI, 2019) and (ASME/ANS, 2013) in the end of Phase II. In the As-is Phase, Shimane Unit 2 PRA is further being updated and upgraded. PRA was updated to reflect the as-built and as-operated plant features resulted from changes made to the plant design and procedure by licensing activities which were performed in parallel with PRA enhancement in the Phase I and Phase II. In addition, we updated the component failure data newly issued for Japanese nuclear power plant and reflected the findings on PRA for other Japanese plant. We addressed Facts and Observations (F&Os) raised in the external expert review conducted in the Phase II. This paper reports the processes and the details of improvements of the internal event at-power PRA for Shimane Unit 2 implemented in the As-is Phase.https://www.jstage.jst.go.jp/article/mej/12/4/12_24-00439/_pdf/-char/enprobabilistic risk assessment (pra)risk informed decision making (ridm)core damage frequency (cdf)containment failure frequency (cff)
spellingShingle Takahiro USUI
Hiroki NAKAMURA
Kenichi IHARA
Hitoshi NOJIMA
Kenichi KANDA
Kazunobu NORIYASU
Daichi SHIOTA
Naoki HIROKAWA
Development of enhanced PRA model for Shimane Unit 2 internal event at-power for reflecting new findings including current plant states
Mechanical Engineering Journal
probabilistic risk assessment (pra)
risk informed decision making (ridm)
core damage frequency (cdf)
containment failure frequency (cff)
title Development of enhanced PRA model for Shimane Unit 2 internal event at-power for reflecting new findings including current plant states
title_full Development of enhanced PRA model for Shimane Unit 2 internal event at-power for reflecting new findings including current plant states
title_fullStr Development of enhanced PRA model for Shimane Unit 2 internal event at-power for reflecting new findings including current plant states
title_full_unstemmed Development of enhanced PRA model for Shimane Unit 2 internal event at-power for reflecting new findings including current plant states
title_short Development of enhanced PRA model for Shimane Unit 2 internal event at-power for reflecting new findings including current plant states
title_sort development of enhanced pra model for shimane unit 2 internal event at power for reflecting new findings including current plant states
topic probabilistic risk assessment (pra)
risk informed decision making (ridm)
core damage frequency (cdf)
containment failure frequency (cff)
url https://www.jstage.jst.go.jp/article/mej/12/4/12_24-00439/_pdf/-char/en
work_keys_str_mv AT takahirousui developmentofenhancedpramodelforshimaneunit2internaleventatpowerforreflectingnewfindingsincludingcurrentplantstates
AT hirokinakamura developmentofenhancedpramodelforshimaneunit2internaleventatpowerforreflectingnewfindingsincludingcurrentplantstates
AT kenichiihara developmentofenhancedpramodelforshimaneunit2internaleventatpowerforreflectingnewfindingsincludingcurrentplantstates
AT hitoshinojima developmentofenhancedpramodelforshimaneunit2internaleventatpowerforreflectingnewfindingsincludingcurrentplantstates
AT kenichikanda developmentofenhancedpramodelforshimaneunit2internaleventatpowerforreflectingnewfindingsincludingcurrentplantstates
AT kazunobunoriyasu developmentofenhancedpramodelforshimaneunit2internaleventatpowerforreflectingnewfindingsincludingcurrentplantstates
AT daichishiota developmentofenhancedpramodelforshimaneunit2internaleventatpowerforreflectingnewfindingsincludingcurrentplantstates
AT naokihirokawa developmentofenhancedpramodelforshimaneunit2internaleventatpowerforreflectingnewfindingsincludingcurrentplantstates