A Practical Method for Analyzing Feasible Generation Region under Security Constraint of Key Transmission Line Section
Under power market circumstances, the monthly safety check of dispatch schedule faces many problems, such as long time span, poor forecast accuracy of power load and new energy power, and high uncertainty of trading energy. Therefore, a practical constructing method for feasible generation region is...
Saved in:
| Main Authors: | Xingyu ZHOU, Xueping PAN, Zhengfeng WANG, Dezhi CHEN |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
State Grid Energy Research Institute
2020-12-01
|
| Series: | Zhongguo dianli |
| Subjects: | |
| Online Access: | https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.202001060 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design and Application of Full-Time Dimension Dispatching Schedule Safety Check
by: Di WU, et al.
Published: (2020-05-01) -
Research on Power Grid Security Check for Provincial Electricity Spot Market
by: Di WU, et al.
Published: (2023-09-01) -
On-line Monitoring of Sag and Icing of Overhead Transmission Lines
by: YANG Xiaolong, et al.
Published: (2023-04-01) -
Research on the Intelligent Bus Scheduling System Based on Genetic Algorithm
by: LIU Jiguo
Published: (2019-01-01) -
Transmission of Electric Energy Along Long Lines
by: Berzan V.P., et al.
Published: (2009-08-01)