Post-evaluation model for 500 kV substation engineering projects using the fuzzy comprehensive evaluation method
To accurately assess the economic benefits and expected outcomes of investing in a 500 kV power transmission and substation project, it is essential to conduct a comprehensive economic evaluation of the entire system. This paper develops a post-evaluation model based on the fuzzy comprehensive evalu...
Saved in:
Main Authors: | Jianquan Chen, Yi Zhuang, Shaoyong Chen, Zhongtian Zhang, Yu Zhang |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2025-02-01
|
Series: | Heliyon |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2405844025007078 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design of the robot mechanism for quality acceptance of insulator installation in 500 kV transmission lines
by: LI Yu, et al.
Published: (2025-01-01) -
EVALUATION SUBSTATION PROTECTION SYSTEM FROM LIGHTNING STRIKES AT 150KV JATIGEDE SUBSTATION
by: Taryo Taryo, et al.
Published: (2025-01-01) -
Recognition and optimization of landscape genes in traditional settlements: a case of Meishan area
by: Huasha Xia, et al.
Published: (2025-02-01) -
Research on the Construction of an Evaluation Index System for Onboard Equipment Status Based on Real-Time Data Analysis
by: Fumin Zou, et al.
Published: (2024-12-01) -
ASSESSMENT OF THE LEVEL OF SAFETY AND HEALTH AT WORK OF THE 400/220/110/20 kV MINTIA POWER SUBSTATION
by: Nicolae Daniel FÎȚĂ, et al.
Published: (2023-12-01)