Optimization of Power System Black Start partition Target Network Taking into Account the Black Start Space-Time Support Capability of New Energy Station

Taking into account the spatiotemporal support capacity of new energy station black start, a target network optimization method for power system black-start zoning is proposed to improve unconventional security defense ability of the new power system. Firstly, extended black-start power source (EBSP...

Full description

Saved in:
Bibliographic Details
Main Authors: Ruixin WANG, Jiguang SUN, Yan LIU, Lun CHENG, Ting XU, Guanghui SUN
Format: Article
Language:zho
Published: State Grid Energy Research Institute 2024-10-01
Series:Zhongguo dianli
Subjects:
Online Access:https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.202403073
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850037819764899840
author Ruixin WANG
Jiguang SUN
Yan LIU
Lun CHENG
Ting XU
Guanghui SUN
author_facet Ruixin WANG
Jiguang SUN
Yan LIU
Lun CHENG
Ting XU
Guanghui SUN
author_sort Ruixin WANG
collection DOAJ
description Taking into account the spatiotemporal support capacity of new energy station black start, a target network optimization method for power system black-start zoning is proposed to improve unconventional security defense ability of the new power system. Firstly, extended black-start power source (EBSPS) is defined based on the concept of spatiotemporal support capability for black start of new energy stations. Secondly, with the optimization objectives of minimizing electrical distance within the partition and the number of interconnections between partitions, an integer linear programming model for partition target network that takes into account EBSPS is established, in which EBSPS is transformed into a constraint on the number of partitions and other constraints such as power balance, partition connectivity, and flexibility resources are considered as well. Finally, the proposed method was validated through a simulation system to aid in the decision-making process for restoring black start zones in new energy stations.
format Article
id doaj-art-2d8b6bf064444e019cee9f287a20f03c
institution DOAJ
issn 1004-9649
language zho
publishDate 2024-10-01
publisher State Grid Energy Research Institute
record_format Article
series Zhongguo dianli
spelling doaj-art-2d8b6bf064444e019cee9f287a20f03c2025-08-20T02:56:45ZzhoState Grid Energy Research InstituteZhongguo dianli1004-96492024-10-01571014314910.11930/j.issn.1004-9649.202403073zgdl-57-10-wangruixinOptimization of Power System Black Start partition Target Network Taking into Account the Black Start Space-Time Support Capability of New Energy StationRuixin WANG0Jiguang SUN1Yan LIU2Lun CHENG3Ting XU4Guanghui SUN5State Grid Hebei Electric Power Co., Ltd., Shijiazhuang 050021, ChinaSchool of Electrical and Electronic Engineering, North China Electric Power University, Baoding 071003, ChinaSchool of Electrical and Electronic Engineering, North China Electric Power University, Baoding 071003, ChinaState Grid Hebei Electric Power Co., Ltd., Shijiazhuang 050021, ChinaSchool of Electrical and Electronic Engineering, North China Electric Power University, Baoding 071003, ChinaState Grid Hebei Electric Power Co., Ltd., Shijiazhuang 050021, ChinaTaking into account the spatiotemporal support capacity of new energy station black start, a target network optimization method for power system black-start zoning is proposed to improve unconventional security defense ability of the new power system. Firstly, extended black-start power source (EBSPS) is defined based on the concept of spatiotemporal support capability for black start of new energy stations. Secondly, with the optimization objectives of minimizing electrical distance within the partition and the number of interconnections between partitions, an integer linear programming model for partition target network that takes into account EBSPS is established, in which EBSPS is transformed into a constraint on the number of partitions and other constraints such as power balance, partition connectivity, and flexibility resources are considered as well. Finally, the proposed method was validated through a simulation system to aid in the decision-making process for restoring black start zones in new energy stations.https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.202403073new energy stationblack-start space-time support capacityblack start partition
spellingShingle Ruixin WANG
Jiguang SUN
Yan LIU
Lun CHENG
Ting XU
Guanghui SUN
Optimization of Power System Black Start partition Target Network Taking into Account the Black Start Space-Time Support Capability of New Energy Station
Zhongguo dianli
new energy station
black-start space-time support capacity
black start partition
title Optimization of Power System Black Start partition Target Network Taking into Account the Black Start Space-Time Support Capability of New Energy Station
title_full Optimization of Power System Black Start partition Target Network Taking into Account the Black Start Space-Time Support Capability of New Energy Station
title_fullStr Optimization of Power System Black Start partition Target Network Taking into Account the Black Start Space-Time Support Capability of New Energy Station
title_full_unstemmed Optimization of Power System Black Start partition Target Network Taking into Account the Black Start Space-Time Support Capability of New Energy Station
title_short Optimization of Power System Black Start partition Target Network Taking into Account the Black Start Space-Time Support Capability of New Energy Station
title_sort optimization of power system black start partition target network taking into account the black start space time support capability of new energy station
topic new energy station
black-start space-time support capacity
black start partition
url https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.202403073
work_keys_str_mv AT ruixinwang optimizationofpowersystemblackstartpartitiontargetnetworktakingintoaccounttheblackstartspacetimesupportcapabilityofnewenergystation
AT jiguangsun optimizationofpowersystemblackstartpartitiontargetnetworktakingintoaccounttheblackstartspacetimesupportcapabilityofnewenergystation
AT yanliu optimizationofpowersystemblackstartpartitiontargetnetworktakingintoaccounttheblackstartspacetimesupportcapabilityofnewenergystation
AT luncheng optimizationofpowersystemblackstartpartitiontargetnetworktakingintoaccounttheblackstartspacetimesupportcapabilityofnewenergystation
AT tingxu optimizationofpowersystemblackstartpartitiontargetnetworktakingintoaccounttheblackstartspacetimesupportcapabilityofnewenergystation
AT guanghuisun optimizationofpowersystemblackstartpartitiontargetnetworktakingintoaccounttheblackstartspacetimesupportcapabilityofnewenergystation