Excavation Face Stability Analysis of EPB Shield in Half-Chamber Tunneling Mode
[Objective] In complex geological environments such as soft upper and hard lower or weathered rock layers, during the construction of EPB (earth pressure balance) full chamber tunneling mode, the slag liquid level is too high, the cutterhead generates excessive torque, causing lots of energy consump...
Saved in:
| Main Authors: | ZHENG Weigang, ZHANG Tao, WU Xinglin, LI Hailong, ZHANG Hongzhi, CHEN Peng, SHU Jicheng |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2025-04-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.039.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Impact and Control Measures of Subway Shield Tunnel Underpassing Ancient Buildings
by: HE Shengya, et al.
Published: (2025-05-01) -
Simulation Analysis on the Mud Film Stability for Urban Slurry Shield Tunnel
by: ZHOU Yu, et al.
Published: (2024-10-01) -
Unstuck Technology for EPB/TBM Dual Mode Shield Machine Stuck in Rock Stratum
by: DUAN Yueqiang
Published: (2025-01-01) -
Muck Improvement Technology for Connection Passage of Shield Tunneling Metro Tunnels in Coastal Areas
by: JIANG Peng, et al.
Published: (2025-01-01) -
Stability Study of Shield Tunnel Excavation Face Induced by Shield Chamber Pressure Entering in Shallow-Buried Sand Stratum
by: GE Jun
Published: (2025-01-01)