Identification of early operational defects in photovoltaic modules: A case study of a 24.9 MWp solar PV system in Sumatra, Indonesia

This study investigates early operational defects in a 24.9 MWp solar PV system located in Sumatra, Indonesia, within its first two years of operation. The primary objective is to identify key issues affecting performance, reliability, and energy output. Field observations revealed several critical...

Full description

Saved in:
Bibliographic Details
Main Author: Elieser Tarigan
Format: Article
Language:English
Published: KeAi Communications Co., Ltd. 2025-04-01
Series:Unconventional Resources
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2666519025000226
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850269569641349120
author Elieser Tarigan
author_facet Elieser Tarigan
author_sort Elieser Tarigan
collection DOAJ
description This study investigates early operational defects in a 24.9 MWp solar PV system located in Sumatra, Indonesia, within its first two years of operation. The primary objective is to identify key issues affecting performance, reliability, and energy output. Field observations revealed several critical defects, with hotspot formation being the most dominant issue. Hotspots, caused by partial shading, cell mismatches, or module damage, result in excessive localized heating, leading to material degradation and significant power losses. Additional defects included glass cracking (282 cases), primarily linked to hotspots and mechanical impacts, and 350 cases of junction box failures due to improper sealing, which pose long-term risks of moisture ingress and diode malfunction. Instances of foggy or discolored glass (delamination) were also identified, reducing light transmission and overall efficiency. Shading from external objects and self-shading between PV arrays exacerbated these problems. The study highlights that half-cut modules outperform full-cell modules in mitigating hotspot risks due to their lower current per cell and enhanced bypass diode configuration. Reducing the number of modules per string further minimizes hotspot severity. Recommendations include regular maintenance, shading mitigation strategies, and optimized system design to enhance performance and reliability. These findings provide valuable insights for improving large-scale PV system durability in real-world conditions.
format Article
id doaj-art-2a4e21aa1405487db00e915967feb866
institution OA Journals
issn 2666-5190
language English
publishDate 2025-04-01
publisher KeAi Communications Co., Ltd.
record_format Article
series Unconventional Resources
spelling doaj-art-2a4e21aa1405487db00e915967feb8662025-08-20T01:53:05ZengKeAi Communications Co., Ltd.Unconventional Resources2666-51902025-04-01610015610.1016/j.uncres.2025.100156Identification of early operational defects in photovoltaic modules: A case study of a 24.9 MWp solar PV system in Sumatra, IndonesiaElieser Tarigan0Electrical Engineering, University of Surabaya, Center for Environmental and Renewable Energy Studies, PuSLET, Surabaya, 60292, IndonesiaThis study investigates early operational defects in a 24.9 MWp solar PV system located in Sumatra, Indonesia, within its first two years of operation. The primary objective is to identify key issues affecting performance, reliability, and energy output. Field observations revealed several critical defects, with hotspot formation being the most dominant issue. Hotspots, caused by partial shading, cell mismatches, or module damage, result in excessive localized heating, leading to material degradation and significant power losses. Additional defects included glass cracking (282 cases), primarily linked to hotspots and mechanical impacts, and 350 cases of junction box failures due to improper sealing, which pose long-term risks of moisture ingress and diode malfunction. Instances of foggy or discolored glass (delamination) were also identified, reducing light transmission and overall efficiency. Shading from external objects and self-shading between PV arrays exacerbated these problems. The study highlights that half-cut modules outperform full-cell modules in mitigating hotspot risks due to their lower current per cell and enhanced bypass diode configuration. Reducing the number of modules per string further minimizes hotspot severity. Recommendations include regular maintenance, shading mitigation strategies, and optimized system design to enhance performance and reliability. These findings provide valuable insights for improving large-scale PV system durability in real-world conditions.http://www.sciencedirect.com/science/article/pii/S2666519025000226PV moduleHotspotShading effectPhotovoltaic
spellingShingle Elieser Tarigan
Identification of early operational defects in photovoltaic modules: A case study of a 24.9 MWp solar PV system in Sumatra, Indonesia
Unconventional Resources
PV module
Hotspot
Shading effect
Photovoltaic
title Identification of early operational defects in photovoltaic modules: A case study of a 24.9 MWp solar PV system in Sumatra, Indonesia
title_full Identification of early operational defects in photovoltaic modules: A case study of a 24.9 MWp solar PV system in Sumatra, Indonesia
title_fullStr Identification of early operational defects in photovoltaic modules: A case study of a 24.9 MWp solar PV system in Sumatra, Indonesia
title_full_unstemmed Identification of early operational defects in photovoltaic modules: A case study of a 24.9 MWp solar PV system in Sumatra, Indonesia
title_short Identification of early operational defects in photovoltaic modules: A case study of a 24.9 MWp solar PV system in Sumatra, Indonesia
title_sort identification of early operational defects in photovoltaic modules a case study of a 24 9 mwp solar pv system in sumatra indonesia
topic PV module
Hotspot
Shading effect
Photovoltaic
url http://www.sciencedirect.com/science/article/pii/S2666519025000226
work_keys_str_mv AT eliesertarigan identificationofearlyoperationaldefectsinphotovoltaicmodulesacasestudyofa249mwpsolarpvsysteminsumatraindonesia