Berth Allocation and Quay Crane Assignment Considering the Uncertain Maintenance Requirements
The strategic optimization of a container terminal’s quayside assets, including the berth and quay cranes, is crucial for maximizing their deployment and utilization. The interrelated and complex challenges of Berth Allocation (BAP) and Quay Crane Scheduling (QCSP) are fundamental to enhancing the r...
Saved in:
Main Authors: | Siwei Li, Liying Song |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2025-01-01
|
Series: | Applied Sciences |
Subjects: | |
Online Access: | https://www.mdpi.com/2076-3417/15/2/660 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Joint Optimization of Berths and Quay Cranes Considering Carbon Emissions: A Case Study of a Container Terminal in China
by: Houjun Lu, et al.
Published: (2025-01-01) -
TELAAH PERMEABILITAS PADA KAWASAN BERSEJARAH CLARKE QUAY DI SINGAPURA
by: Ari Widyati Purwantiasning, et al.
Published: (2022-06-01) -
Integrated Berth Allocation and Time-Variant Quay Crane Scheduling with Tidal Impact in Approach Channel
by: Xiaogang Jiao, et al.
Published: (2018-01-01) -
Development of Automatic Berthing Support Program for Autonomous Ships
by: Byung-Sun Kang, et al.
Published: (2024-12-01) -
Research on berth occupancy prediction model based on attention mechanism
by: Zhurong WANG, et al.
Published: (2020-12-01)