Traction Calculation and Simulation Analysis for Nanchang Metro Line 1 Vehicles

Base situation of Nanchang metro line 1 vehicles was introduced. The vehicle dynamic performance and the traction & braking characteristics were calculated and simulated, as well as the rescue capability and power consumption. The calculation and simulation results showed that the performance of...

Full description

Saved in:
Bibliographic Details
Main Author: XIONG Jun
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2016-01-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2016.02.016
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850142764923092992
author XIONG Jun
author_facet XIONG Jun
author_sort XIONG Jun
collection DOAJ
description Base situation of Nanchang metro line 1 vehicles was introduced. The vehicle dynamic performance and the traction & braking characteristics were calculated and simulated, as well as the rescue capability and power consumption. The calculation and simulation results showed that the performance of electric drive system met the design requirements. The Nanchang metro line 1 vehicles and their electric drive systems have passed the field type test and running inspection, and now are operating with passengers, which show a good performance.
format Article
id doaj-art-29b77deb1f97482886e47d71fee3f585
institution OA Journals
issn 1000-128X
language zho
publishDate 2016-01-01
publisher Editorial Department of Electric Drive for Locomotives
record_format Article
series 机车电传动
spelling doaj-art-29b77deb1f97482886e47d71fee3f5852025-08-20T02:28:56ZzhoEditorial Department of Electric Drive for Locomotives机车电传动1000-128X2016-01-01616420918296Traction Calculation and Simulation Analysis for Nanchang Metro Line 1 VehiclesXIONG JunBase situation of Nanchang metro line 1 vehicles was introduced. The vehicle dynamic performance and the traction & braking characteristics were calculated and simulated, as well as the rescue capability and power consumption. The calculation and simulation results showed that the performance of electric drive system met the design requirements. The Nanchang metro line 1 vehicles and their electric drive systems have passed the field type test and running inspection, and now are operating with passengers, which show a good performance.http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2016.02.016Nanchang metro line 1metro vehiclestraction systemdegraded moderescue capabilitysimulation
spellingShingle XIONG Jun
Traction Calculation and Simulation Analysis for Nanchang Metro Line 1 Vehicles
机车电传动
Nanchang metro line 1
metro vehicles
traction system
degraded mode
rescue capability
simulation
title Traction Calculation and Simulation Analysis for Nanchang Metro Line 1 Vehicles
title_full Traction Calculation and Simulation Analysis for Nanchang Metro Line 1 Vehicles
title_fullStr Traction Calculation and Simulation Analysis for Nanchang Metro Line 1 Vehicles
title_full_unstemmed Traction Calculation and Simulation Analysis for Nanchang Metro Line 1 Vehicles
title_short Traction Calculation and Simulation Analysis for Nanchang Metro Line 1 Vehicles
title_sort traction calculation and simulation analysis for nanchang metro line 1 vehicles
topic Nanchang metro line 1
metro vehicles
traction system
degraded mode
rescue capability
simulation
url http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2016.02.016
work_keys_str_mv AT xiongjun tractioncalculationandsimulationanalysisfornanchangmetroline1vehicles