Efficiency Evaluation of Construction of Steam-Turbine Power Plants at Industrial Enterprises
It is shown that application of own power stations at an industrial enterprise is considered as an expedient one if there is an availability of thermal power sources because value of an optimization criterion exceeds corresponding optimization criterion by 2.1-4.6 fold when an enterprise is supplied...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2007-06-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/622 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832557220654481408 |
---|---|
author | A. L. Starzhinsky |
author_facet | A. L. Starzhinsky |
author_sort | A. L. Starzhinsky |
collection | DOAJ |
description | It is shown that application of own power stations at an industrial enterprise is considered as an expedient one if there is an availability of thermal power sources because value of an optimization criterion exceeds corresponding optimization criterion by 2.1-4.6 fold when an enterprise is supplied with power only from power system networks. |
format | Article |
id | doaj-art-29a0a6f32fa346f8a0b2877f6b61f73d |
institution | Kabale University |
issn | 1029-7448 2414-0341 |
language | Russian |
publishDate | 2007-06-01 |
publisher | Belarusian National Technical University |
record_format | Article |
series | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
spelling | doaj-art-29a0a6f32fa346f8a0b2877f6b61f73d2025-02-03T05:35:44ZrusBelarusian National Technical UniversityИзвестия высших учебных заведений и энергетических объединенний СНГ: Энергетика1029-74482414-03412007-06-01032632615Efficiency Evaluation of Construction of Steam-Turbine Power Plants at Industrial EnterprisesA. L. StarzhinskyIt is shown that application of own power stations at an industrial enterprise is considered as an expedient one if there is an availability of thermal power sources because value of an optimization criterion exceeds corresponding optimization criterion by 2.1-4.6 fold when an enterprise is supplied with power only from power system networks.https://energy.bntu.by/jour/article/view/622 |
spellingShingle | A. L. Starzhinsky Efficiency Evaluation of Construction of Steam-Turbine Power Plants at Industrial Enterprises Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
title | Efficiency Evaluation of Construction of Steam-Turbine Power Plants at Industrial Enterprises |
title_full | Efficiency Evaluation of Construction of Steam-Turbine Power Plants at Industrial Enterprises |
title_fullStr | Efficiency Evaluation of Construction of Steam-Turbine Power Plants at Industrial Enterprises |
title_full_unstemmed | Efficiency Evaluation of Construction of Steam-Turbine Power Plants at Industrial Enterprises |
title_short | Efficiency Evaluation of Construction of Steam-Turbine Power Plants at Industrial Enterprises |
title_sort | efficiency evaluation of construction of steam turbine power plants at industrial enterprises |
url | https://energy.bntu.by/jour/article/view/622 |
work_keys_str_mv | AT alstarzhinsky efficiencyevaluationofconstructionofsteamturbinepowerplantsatindustrialenterprises |