Creep Parameter Inversion and Long-Term Stability Analysis of Tunnel Based on GP-DE Intelligent Algorithm

Aiming at the creep problem of Banshi Tunnel in Jilin province, the creep laws of rock are analyzed by the creep test, and the Cvsic model describing the creep characteristics of the tunnel is established. To obtain the creep parameters accurately, considering the advantages of Gauss process and dif...

Full description

Saved in:
Bibliographic Details
Main Authors: Fengrui Zhang, Annan Jiang, Xinping Guo, Xiurong Yang
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Materials Science and Engineering
Online Access:http://dx.doi.org/10.1155/2021/3769474
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Aiming at the creep problem of Banshi Tunnel in Jilin province, the creep laws of rock are analyzed by the creep test, and the Cvsic model describing the creep characteristics of the tunnel is established. To obtain the creep parameters accurately, considering the advantages of Gauss process and differential evolution algorithm, coupling the two methods, a Gauss process-differential evolution intelligent inversion method is proposed. According to on-site monitoring data, the the creep parameters of the tunnel are accurately inverted. On this basis, the stability analysis of the tunnel and the selection of a reasonable construction plan are carried out. The research results show that to ensure the stability of the tunnel, the construction scheme of initial lining + pipe shed + advanced grouting anchor rod should be adopted. The research results have guiding significance for the long-term stability evaluation of the tunnel.
ISSN:1687-8434
1687-8442