Utilizing fuzzy banana curve for project monitoring and control
A key responsibility of project management is to control and monitor project progress. One commonly used tool is the S-curve, which highlights any deviations from the project plan. Another proper curve is the Banana curve, a variation of the S-curve that shows the earliest and latest times of the pr...
Saved in:
| Main Authors: | Mahmood Jahanbani, Hamid Shahbandarzadeh |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Ayandegan Institute of Higher Education,
2024-09-01
|
| Series: | International Journal of Research in Industrial Engineering |
| Subjects: | |
| Online Access: | https://www.riejournal.com/article_202115_539f3c49a0d8e8189f677dc3210f567f.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Unlocking The Potential of Lampung Agricultural Waste: Banana Kepok Peel Silage (Musa × Paradisiaca) for Ruminant Nutrition Through an Optimization of Ensiling Time
by: Deviany Deviany, et al.
Published: (2024-09-01) -
MODELING OF BOND YIELD CURVE USING CUBIC BEZIER CURVE
by: Emy Siswanah
Published: (2022-12-01) -
Effect of Glycerol Concentration and Filler Addition on the Properties of Bioplastics Derived from Kepok Banana Corm Starch
by: Halimatuddahliana Nasution, et al.
Published: (2025-05-01) -
A New Method to Obtain PH-Helical Curves in E^(n+1)
by: Çetin Camcı, et al.
Published: (2021-12-01) -
Variabilidade genética de genótipos de bananeira (Musa spp) submetidos ao estresse salino Genetic variability of banana (Musa spp) genotypes subjected to saline stress
by: Eline W. F. Gomes, et al.
Published: (2005-06-01)