THE PROSPECT OF MINIMISING PRODUCTION FLOW WASTE ON CONSTRUCTION SITES IN NIGERIA THROUGH THE LAST PLANNER® SYSTEM
Poor performance of construction projects is a re-occurring problem in Nigeria. Production flow waste (ranging from waiting time, material handling and over- production, among others) may be partly responsible for this problem. Meanwhile, very little is known about the role of the Last Planner Syst...
Saved in:
| Main Authors: | Emmanuel Itodo DANIEL, Christine PASQUIRE, Oko John AMEH |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
UJ Press
2017-06-01
|
| Series: | Journal of Construction Project Management and Innovation |
| Subjects: | |
| Online Access: | https://journals.uj.ac.za/index.php/JCPMI/article/view/122 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Takt complementing Last Planner® System on residential construction projects.
by: William Power
Published: (2024-10-01) -
The Dilemmas of Rural Planning and Planners in Oyo State, Nigeria
by: Popoola Ayobami Abayomi, et al.
Published: (2020-03-01) -
Kanban applied to construction: a literature review
by: Joaquin Fuentes-del-Burgo, et al.
Published: (2024-07-01) -
Integración de la metodología Lean en proyectos de construcción en México (2016–2022)
by: Andrés Bustos Acevedo, et al.
Published: (2025-07-01) -
IMPACT OF LEAN CONSTRUCTION IMPLEMENTATION ON CONSTRUCTION BUILDING PROJECTS
by: Abdhy Gazali, et al.
Published: (2025-05-01)