Design and Ground Verification of Space Station Manipulator Control Method for Orbital Replacement Unit Changeout
Chinese space station has been in construction phase, and it will be launched around 2020. Lots of orbital replacement units (ORUs) are installed on the space station, and they need to be replaced on orbit by a manipulator. In view of above application requirements, the control method for ORU change...
Saved in:
| Main Authors: | Bingshan Hu, Feng Chen, Liangliang Han, Huanlong Chen, Hongliu Yu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2018-01-01
|
| Series: | International Journal of Aerospace Engineering |
| Online Access: | http://dx.doi.org/10.1155/2018/4271035 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Research and Ground Verification of the Force Compliance Control Method for Space Station Manipulator
by: Bingshan Hu, et al.
Published: (2020-01-01) -
Wood-Burning Device Changeout: Modeling the Impact on PM2.5 Concentrations in a Remote Subarctic Urban Nonattainment Area
by: Huy N. Q. Tran, et al.
Published: (2012-01-01) -
Multibody Dynamics Analysis for the Belt Drive System of the Centrifuge in Space Station
by: Li Tengfei, et al.
Published: (2016-01-01) -
Review of Autonomous Space Robotic Manipulators for On-Orbit Servicing and Active Debris Removal
by: Nasim Fallahiarezoodar, et al.
Published: (2025-01-01) -
Ambiguity Resolution Strategy for GPS/LEO Integrated Orbit Determination Based on Regional Ground Stations
by: Xiao Liu, et al.
Published: (2025-04-01)