4D Applications of GIS in Construction Management
Construction industries broadly involve different set of construction activities which are to be executed as per schedule and the major software used for scheduling is PRIMAVERA and Microsoft Project (MSP). But the software still lacks a feature of providing spatial aspects of information in constru...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2017-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2017/1048540 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832553525065809920 |
---|---|
author | A. Chaitanya Kumar T. Reshma |
author_facet | A. Chaitanya Kumar T. Reshma |
author_sort | A. Chaitanya Kumar |
collection | DOAJ |
description | Construction industries broadly involve different set of construction activities which are to be executed as per schedule and the major software used for scheduling is PRIMAVERA and Microsoft Project (MSP). But the software still lacks a feature of providing spatial aspects of information in construction schedule. Recently, advanced technology like 4D GIS plays a major role in overcoming the limitation of the software. 4D GIS technology includes integration of 2D drawings from AutoCAD and schedules prepared in PRIMAVERA software. In the present study, a multistair residential building has been selected. ARCMAP 10.2 is used for interlinking of schedules as well as drawings and ARCSCENE has been used for developing 4D view. This linkage between scheduled activities and respective drawings in GIS helps in identifying construction sequences and also in detecting logical errors that occur in project schedules. The developed 4D view provides better visualization of construction progress of a project. |
format | Article |
id | doaj-art-20ccea054ff642ec8fe5cece0d85f5dc |
institution | Kabale University |
issn | 1687-8086 1687-8094 |
language | English |
publishDate | 2017-01-01 |
publisher | Wiley |
record_format | Article |
series | Advances in Civil Engineering |
spelling | doaj-art-20ccea054ff642ec8fe5cece0d85f5dc2025-02-03T05:53:44ZengWileyAdvances in Civil Engineering1687-80861687-80942017-01-01201710.1155/2017/104854010485404D Applications of GIS in Construction ManagementA. Chaitanya Kumar0T. Reshma1KL University, Vaddeswaram, Guntur, Andhra Pradesh, IndiaDepartment of Civil Engineering, KL University, Vaddeswaram, Guntur, Andhra Pradesh, IndiaConstruction industries broadly involve different set of construction activities which are to be executed as per schedule and the major software used for scheduling is PRIMAVERA and Microsoft Project (MSP). But the software still lacks a feature of providing spatial aspects of information in construction schedule. Recently, advanced technology like 4D GIS plays a major role in overcoming the limitation of the software. 4D GIS technology includes integration of 2D drawings from AutoCAD and schedules prepared in PRIMAVERA software. In the present study, a multistair residential building has been selected. ARCMAP 10.2 is used for interlinking of schedules as well as drawings and ARCSCENE has been used for developing 4D view. This linkage between scheduled activities and respective drawings in GIS helps in identifying construction sequences and also in detecting logical errors that occur in project schedules. The developed 4D view provides better visualization of construction progress of a project.http://dx.doi.org/10.1155/2017/1048540 |
spellingShingle | A. Chaitanya Kumar T. Reshma 4D Applications of GIS in Construction Management Advances in Civil Engineering |
title | 4D Applications of GIS in Construction Management |
title_full | 4D Applications of GIS in Construction Management |
title_fullStr | 4D Applications of GIS in Construction Management |
title_full_unstemmed | 4D Applications of GIS in Construction Management |
title_short | 4D Applications of GIS in Construction Management |
title_sort | 4d applications of gis in construction management |
url | http://dx.doi.org/10.1155/2017/1048540 |
work_keys_str_mv | AT achaitanyakumar 4dapplicationsofgisinconstructionmanagement AT treshma 4dapplicationsofgisinconstructionmanagement |