Design of Seepage Prevention Curtain in Tianshengqiao Hydropower Station In Tongren City of Guizhou
Saved in:
Main Author: | ZHANG Guan-hui |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2009-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47662563&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Safety Supervision of Civil Engineering Work in Dam of Guangzhao Hydropower Station in Guizhou
by: CHEN Cuang-ping
Published: (2009-01-01) -
Anti-seepage Measures for Earth-rock Cofferdam of Gaofengshan Hydropower Station and Its Construction
by: 何育文, et al.
Published: (2004-01-01) -
Construction Design of the Honghua Hydropower Station
by: ZHANG Song-feng
Published: (2006-01-01) -
Research on Anti-seepage Curtain Layout of a Deep Foundation Pit near the Levee
by: WANG Xuehong, et al.
Published: (2021-01-01) -
General Design and Layout of Datengxia Hydropower Station
by: ZHANG Xiao, et al.
Published: (2022-01-01)