Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México
We propose a methodology for determination of Allowance Time (AT), based on heart rate and work sampling of a production line composed of thirteen stations operated by four workers. The current production line presents a high rate of personnel turnover and absenteeism and with an AT value establishe...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Journal of Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/1316734 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1832559057529995264 |
---|---|
author | Karen Y. Ferreira García Jorge de la Riva Rodriguez Jaime Sánchez Leal Rosa M. Reyes-Martínez Arturo Woocay Prieto |
author_facet | Karen Y. Ferreira García Jorge de la Riva Rodriguez Jaime Sánchez Leal Rosa M. Reyes-Martínez Arturo Woocay Prieto |
author_sort | Karen Y. Ferreira García |
collection | DOAJ |
description | We propose a methodology for determination of Allowance Time (AT), based on heart rate and work sampling of a production line composed of thirteen stations operated by four workers. The current production line presents a high rate of personnel turnover and absenteeism and with an AT value established by the company of 6.3%. The AT determination is of critical importance, given that through this the workers need to maintain their work rhythm at 100% during the entire workday without fatigue. The resulting allowance after the study was 15% instead of 6.3%, increasing the standard time and causing a decrease in personnel turnover and absenteeism and consequently increasing the production capacity and the reduction of costs. |
format | Article |
id | doaj-art-1edb35cf8f4a435483c9ec69deb42cc2 |
institution | Kabale University |
issn | 2314-4904 2314-4912 |
language | English |
publishDate | 2019-01-01 |
publisher | Wiley |
record_format | Article |
series | Journal of Engineering |
spelling | doaj-art-1edb35cf8f4a435483c9ec69deb42cc22025-02-03T01:30:56ZengWileyJournal of Engineering2314-49042314-49122019-01-01201910.1155/2019/13167341316734Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez MéxicoKaren Y. Ferreira García0Jorge de la Riva Rodriguez1Jaime Sánchez Leal2Rosa M. Reyes-Martínez3Arturo Woocay Prieto4Division of Postgraduate Studies and Research, Tecnológico Nacional de México/Instituto Tecnológico de Ciudad Juárez, Ciudad Juárez 32500, MexicoDivision of Postgraduate Studies and Research, Tecnológico Nacional de México/Instituto Tecnológico de Ciudad Juárez, Ciudad Juárez 32500, MexicoDivision of Postgraduate Studies and Research, Tecnológico Nacional de México/Instituto Tecnológico de Ciudad Juárez, Ciudad Juárez 32500, MexicoDivision of Postgraduate Studies and Research, Tecnológico Nacional de México/Instituto Tecnológico de Ciudad Juárez, Ciudad Juárez 32500, MexicoDivision of Postgraduate Studies and Research, Tecnológico Nacional de México/Instituto Tecnológico de Ciudad Juárez, Ciudad Juárez 32500, MexicoWe propose a methodology for determination of Allowance Time (AT), based on heart rate and work sampling of a production line composed of thirteen stations operated by four workers. The current production line presents a high rate of personnel turnover and absenteeism and with an AT value established by the company of 6.3%. The AT determination is of critical importance, given that through this the workers need to maintain their work rhythm at 100% during the entire workday without fatigue. The resulting allowance after the study was 15% instead of 6.3%, increasing the standard time and causing a decrease in personnel turnover and absenteeism and consequently increasing the production capacity and the reduction of costs.http://dx.doi.org/10.1155/2019/1316734 |
spellingShingle | Karen Y. Ferreira García Jorge de la Riva Rodriguez Jaime Sánchez Leal Rosa M. Reyes-Martínez Arturo Woocay Prieto Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México Journal of Engineering |
title | Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México |
title_full | Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México |
title_fullStr | Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México |
title_full_unstemmed | Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México |
title_short | Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México |
title_sort | determination of allowance time by work sampling and heart rate in manufacturing plant in juarez mexico |
url | http://dx.doi.org/10.1155/2019/1316734 |
work_keys_str_mv | AT karenyferreiragarcia determinationofallowancetimebyworksamplingandheartrateinmanufacturingplantinjuarezmexico AT jorgedelarivarodriguez determinationofallowancetimebyworksamplingandheartrateinmanufacturingplantinjuarezmexico AT jaimesanchezleal determinationofallowancetimebyworksamplingandheartrateinmanufacturingplantinjuarezmexico AT rosamreyesmartinez determinationofallowancetimebyworksamplingandheartrateinmanufacturingplantinjuarezmexico AT arturowoocayprieto determinationofallowancetimebyworksamplingandheartrateinmanufacturingplantinjuarezmexico |