Reliability Assessment for a Safety-Related Digital Reactor Protection System Using Event-Tree/Fault-Tree (ET/FT) Method

The aim of this study is to verify if the reliability of a digital four-channel RPS under the design phase satisfies the specified target and to identify the weakness of system design and potential solutions for system reliability improvement. The event-tree/fault-tree (ET/FT), which is the method u...

Full description

Saved in:
Bibliographic Details
Main Authors: Qingzhu Liang, Mingxing Liu, Peng Xiao, Yun Guo, Jun Xiao, Changhong Peng
Format: Article
Language:English
Published: Wiley 2020-01-01
Series:Science and Technology of Nuclear Installations
Online Access:http://dx.doi.org/10.1155/2020/8839399
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:The aim of this study is to verify if the reliability of a digital four-channel RPS under the design phase satisfies the specified target and to identify the weakness of system design and potential solutions for system reliability improvement. The event-tree/fault-tree (ET/FT), which is the method used in the current probabilistic safety assessment (PSA) framework of nuclear power plants (NPPs), was adopted to developed reliability modeling for the RPS with the Top Events defined as the system failure to generate reactor trip signal and the system generating spurious trip signal. The evaluation results indicate that the probability of the system failure on demand and the frequency of spurious trip signal generation are 1.47 × 10−6 with a 95% upper bound of 4.63 × 10−6 and 7.94 × 10−4/year with a 95% upper bound of 2.50 × 10−3/year, respectively. The importance and sensitivity analyses were conducted and it was found that undetected unsafe common cause failures (CCFs) of signal conditioning modules (SCMs) dominate the system reliability. Two preliminary optimization schemes relative to reducing periodic test interval and adapting two kinds of diverse SCMs were proposed. Results of the quantitive evaluation of the schemes show that neither of them could determinedly improve the system reliability to the target level. In the future, more detailed optimization analysis shall be required to determine a feasible system design optimization scheme.
ISSN:1687-6075