Risk Evaluation of Multi-objective Dispatching Scheme for Shaanxi Hanjiang-to-Weihe River Diversion Project

Hanjiang-to-Weihe River Diversion Project in Shanxi Province is aninter-basin water diversion project to solve the water shortage in Guanzhong andnorthern Shaanxi provinces. In order to give full play to the benefits of theproject, it is necessary to evaluate the risk of reservoir group operation sc...

Full description

Saved in:
Bibliographic Details
Main Authors: GAO Chen, REN Mengzhi, LIU Dengfeng, HUANG Qiang
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2020-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2020.10.000
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841535605308129280
author GAO Chen
REN Mengzhi
LIU Dengfeng
HUANG Qiang
author_facet GAO Chen
REN Mengzhi
LIU Dengfeng
HUANG Qiang
author_sort GAO Chen
collection DOAJ
description Hanjiang-to-Weihe River Diversion Project in Shanxi Province is aninter-basin water diversion project to solve the water shortage in Guanzhong andnorthern Shaanxi provinces. In order to give full play to the benefits of theproject, it is necessary to evaluate the risk of reservoir group operation scheme.Under two operation modes for giving priority to water supply for the HuangjinxiaReservoir and the Sanhekou Reservoir, this paper establishes the risk evaluationindex system of multi-objective operation of Hanjiang-to-Weihe Diversion Projectbased on the objective of operation, assigns the weight to each index by AHP, andobtains the risk value of each operation scheme by TOPSIS (Technique for OrderPreference by Similarity to Ideal Solution) method, which provides technicalsupport for the final decision. After evaluation of operation schemes under twoprior water supply modes, respectively, the results show that the comprehensiverisk of the scheme is mainly affected by insufficient indicators of water supplyrisk; the comprehensive risk rate of the two schemes under mode 1 of prior watersupply for Huangjinxia Reservoir is lower than that of the two schemes under mode2 of prior water supply for Sanhekou Reservoir, and the two schemes under mode 1have better water supply recovery than that under mode 2. Therefore, two schemesunder the mode 1 are recommended.
format Article
id doaj-art-1dbe582d3ecd4b849d961eca083fb44c
institution Kabale University
issn 1001-9235
language zho
publishDate 2020-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-1dbe582d3ecd4b849d961eca083fb44c2025-01-15T02:30:22ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352020-01-014147649780Risk Evaluation of Multi-objective Dispatching Scheme for Shaanxi Hanjiang-to-Weihe River Diversion ProjectGAO ChenREN MengzhiLIU DengfengHUANG QiangHanjiang-to-Weihe River Diversion Project in Shanxi Province is aninter-basin water diversion project to solve the water shortage in Guanzhong andnorthern Shaanxi provinces. In order to give full play to the benefits of theproject, it is necessary to evaluate the risk of reservoir group operation scheme.Under two operation modes for giving priority to water supply for the HuangjinxiaReservoir and the Sanhekou Reservoir, this paper establishes the risk evaluationindex system of multi-objective operation of Hanjiang-to-Weihe Diversion Projectbased on the objective of operation, assigns the weight to each index by AHP, andobtains the risk value of each operation scheme by TOPSIS (Technique for OrderPreference by Similarity to Ideal Solution) method, which provides technicalsupport for the final decision. After evaluation of operation schemes under twoprior water supply modes, respectively, the results show that the comprehensiverisk of the scheme is mainly affected by insufficient indicators of water supplyrisk; the comprehensive risk rate of the two schemes under mode 1 of prior watersupply for Huangjinxia Reservoir is lower than that of the two schemes under mode2 of prior water supply for Sanhekou Reservoir, and the two schemes under mode 1have better water supply recovery than that under mode 2. Therefore, two schemesunder the mode 1 are recommended.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2020.10.000Hanjiang-to-Weihe River Diversion Projectmulti-objective reservoirdispatchingrisk evaluationAHPTOPSIS
spellingShingle GAO Chen
REN Mengzhi
LIU Dengfeng
HUANG Qiang
Risk Evaluation of Multi-objective Dispatching Scheme for Shaanxi Hanjiang-to-Weihe River Diversion Project
Renmin Zhujiang
Hanjiang-to-Weihe River Diversion Project
multi-objective reservoirdispatching
risk evaluation
AHP
TOPSIS
title Risk Evaluation of Multi-objective Dispatching Scheme for Shaanxi Hanjiang-to-Weihe River Diversion Project
title_full Risk Evaluation of Multi-objective Dispatching Scheme for Shaanxi Hanjiang-to-Weihe River Diversion Project
title_fullStr Risk Evaluation of Multi-objective Dispatching Scheme for Shaanxi Hanjiang-to-Weihe River Diversion Project
title_full_unstemmed Risk Evaluation of Multi-objective Dispatching Scheme for Shaanxi Hanjiang-to-Weihe River Diversion Project
title_short Risk Evaluation of Multi-objective Dispatching Scheme for Shaanxi Hanjiang-to-Weihe River Diversion Project
title_sort risk evaluation of multi objective dispatching scheme for shaanxi hanjiang to weihe river diversion project
topic Hanjiang-to-Weihe River Diversion Project
multi-objective reservoirdispatching
risk evaluation
AHP
TOPSIS
url http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2020.10.000
work_keys_str_mv AT gaochen riskevaluationofmultiobjectivedispatchingschemeforshaanxihanjiangtoweiheriverdiversionproject
AT renmengzhi riskevaluationofmultiobjectivedispatchingschemeforshaanxihanjiangtoweiheriverdiversionproject
AT liudengfeng riskevaluationofmultiobjectivedispatchingschemeforshaanxihanjiangtoweiheriverdiversionproject
AT huangqiang riskevaluationofmultiobjectivedispatchingschemeforshaanxihanjiangtoweiheriverdiversionproject