Waterproof performance and failure mechanism of GINA gasket subject to diverse joint deformations: A case study of the Yuliangzhou immersed tunnel
GINA gasket serving as the primary sealing unit of the element joint, directly influences the waterproof performance and longevity of the immersed tunnel. The Yuliangzhou immersed tunnel in China was taken as the research background. Compression deformation tests and corresponding numerical simulati...
Saved in:
| Main Authors: | Zhinan Hu, Yadong Sun, Lian Jiang, Hongtao Mao, Yu Xu, Yonghuan Luo |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Elsevier
2025-07-01
|
| Series: | Case Studies in Construction Materials |
| Subjects: | |
| Online Access: | http://www.sciencedirect.com/science/article/pii/S2214509525002475 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Aging properties and mechanism of GINA gaskets on immersed tunnel element joint subjected to seawater environment: A multi-scale experimental study
by: Hongtao Mao, et al.
Published: (2025-07-01) -
Deep learning based gasket fault detection: a CNN approach
by: S. Arumai Shiney, et al.
Published: (2025-02-01) -
Hazards of Waterproof Board Cutting Secondary Lining in Operating Tunnel and Remediation Schemes
by: SHI Yunfei, et al.
Published: (2024-10-01) -
Investigating Impact of Gasket Cylinder Addition and Octane Rating on Engine Performance
by: Bahtiar Rahmat, et al.
Published: (2024-10-01) -
A Study on the Heat Transfer Characteristics of Refrigerating Cabinet Gasket
by: Chen Qi, et al.
Published: (2015-01-01)