An Investigation on Construction Project Development Planning Delays in South Africa

This article aims to determine the causes of the delays in South African construction project planning, discussing the centralised hierarchical planning system factors, multiple agencies/spheres of government regarding building-permit approval factors, and systems and spheres of government/multiple...

Full description

Saved in:
Bibliographic Details
Main Authors: Bedan Nyaga Githae, Hakim Hagir, Rebecca Alowo
Format: Article
Language:English
Published: MDPI AG 2024-09-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/14/9/2963
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850258285488242688
author Bedan Nyaga Githae
Hakim Hagir
Rebecca Alowo
author_facet Bedan Nyaga Githae
Hakim Hagir
Rebecca Alowo
author_sort Bedan Nyaga Githae
collection DOAJ
description This article aims to determine the causes of the delays in South African construction project planning, discussing the centralised hierarchical planning system factors, multiple agencies/spheres of government regarding building-permit approval factors, and systems and spheres of government/multiple agencies for improving preconstruction project planning in South Africa. It also describes a one-stop centre as a framework for improving South African preconstruction planning. The nature of planning in South Africa is influenced by many legislative measures. The delays being experienced in the educational infrastructure project have attributed to the backlogs currently existing in the delivery of basic education infrastructure. This study was conducted using a quantitative research design technique to assess the secondary data findings through primary data gathered on about 106 construction industry operatives. The primary data collected from the 106 construction operatives focused on architects, engineers, surveyors, and contractors. The researchers conducted a pilot survey with experts/professionals before an industry-wide survey as a questionnaire pretest. The finalised questionnaire was used as a data-gathering technique in the quantitative study approach. A focus group discussion was held to validate the findings. The collected information was then subjected to quantitative analysis in SPSS Version: 29.0.2.0 to verify the veracity of the research. According to the findings, a one-stop centre would enhance systems and sectors of government/multiple agencies and prevent preconstruction project-planning delays in South Africa. A centralised hierarchical planning system is essential for reducing preconstruction-planning delays and multiple agencies/sectors of the government delaying building-permit approvals. The critical research contribution is in that expanding on what is already known about preconstruction project planning in South Africa, this study shows how crucial it is to identify and understand the factors that influence preconstruction project planning in that country. The limitation, however, is that, regarding South Africa, the available literature indicates that there is a problem with systems responsible for approving construction projects. In conclusion, by proposing a structure known as the one-stop centre (OSC) to address the issues that lead to delays in preconstruction project planning in South Africa, this study offers a significant contribution.
format Article
id doaj-art-1a8dd8642e444df3a9d0e739dd1d4de2
institution OA Journals
issn 2075-5309
language English
publishDate 2024-09-01
publisher MDPI AG
record_format Article
series Buildings
spelling doaj-art-1a8dd8642e444df3a9d0e739dd1d4de22025-08-20T01:56:12ZengMDPI AGBuildings2075-53092024-09-01149296310.3390/buildings14092963An Investigation on Construction Project Development Planning Delays in South AfricaBedan Nyaga Githae0Hakim Hagir1Rebecca Alowo2School of Energy, Geosciences, Infrastructure and Society, Heriot Watt University, Edinburg EH14 4AS, UKSchool of Energy, Geosciences, Infrastructure and Society, Heriot Watt University, Edinburg EH14 4AS, UKFaculty of Engineering and Built Environment, University of Johannesburg, Johannesburg 2006, South AfricaThis article aims to determine the causes of the delays in South African construction project planning, discussing the centralised hierarchical planning system factors, multiple agencies/spheres of government regarding building-permit approval factors, and systems and spheres of government/multiple agencies for improving preconstruction project planning in South Africa. It also describes a one-stop centre as a framework for improving South African preconstruction planning. The nature of planning in South Africa is influenced by many legislative measures. The delays being experienced in the educational infrastructure project have attributed to the backlogs currently existing in the delivery of basic education infrastructure. This study was conducted using a quantitative research design technique to assess the secondary data findings through primary data gathered on about 106 construction industry operatives. The primary data collected from the 106 construction operatives focused on architects, engineers, surveyors, and contractors. The researchers conducted a pilot survey with experts/professionals before an industry-wide survey as a questionnaire pretest. The finalised questionnaire was used as a data-gathering technique in the quantitative study approach. A focus group discussion was held to validate the findings. The collected information was then subjected to quantitative analysis in SPSS Version: 29.0.2.0 to verify the veracity of the research. According to the findings, a one-stop centre would enhance systems and sectors of government/multiple agencies and prevent preconstruction project-planning delays in South Africa. A centralised hierarchical planning system is essential for reducing preconstruction-planning delays and multiple agencies/sectors of the government delaying building-permit approvals. The critical research contribution is in that expanding on what is already known about preconstruction project planning in South Africa, this study shows how crucial it is to identify and understand the factors that influence preconstruction project planning in that country. The limitation, however, is that, regarding South Africa, the available literature indicates that there is a problem with systems responsible for approving construction projects. In conclusion, by proposing a structure known as the one-stop centre (OSC) to address the issues that lead to delays in preconstruction project planning in South Africa, this study offers a significant contribution.https://www.mdpi.com/2075-5309/14/9/2963policypreconstructionplanningbuilding regulationsdelaysgovernment spheres
spellingShingle Bedan Nyaga Githae
Hakim Hagir
Rebecca Alowo
An Investigation on Construction Project Development Planning Delays in South Africa
Buildings
policy
preconstruction
planning
building regulations
delays
government spheres
title An Investigation on Construction Project Development Planning Delays in South Africa
title_full An Investigation on Construction Project Development Planning Delays in South Africa
title_fullStr An Investigation on Construction Project Development Planning Delays in South Africa
title_full_unstemmed An Investigation on Construction Project Development Planning Delays in South Africa
title_short An Investigation on Construction Project Development Planning Delays in South Africa
title_sort investigation on construction project development planning delays in south africa
topic policy
preconstruction
planning
building regulations
delays
government spheres
url https://www.mdpi.com/2075-5309/14/9/2963
work_keys_str_mv AT bedannyagagithae aninvestigationonconstructionprojectdevelopmentplanningdelaysinsouthafrica
AT hakimhagir aninvestigationonconstructionprojectdevelopmentplanningdelaysinsouthafrica
AT rebeccaalowo aninvestigationonconstructionprojectdevelopmentplanningdelaysinsouthafrica
AT bedannyagagithae investigationonconstructionprojectdevelopmentplanningdelaysinsouthafrica
AT hakimhagir investigationonconstructionprojectdevelopmentplanningdelaysinsouthafrica
AT rebeccaalowo investigationonconstructionprojectdevelopmentplanningdelaysinsouthafrica