New Chemical Grouting Materials and Rapid Construction Technology for Inclined Shaft Penetrating Drift-Sand Layer in Coal Mine
Drift-sand layer is a common weak stratum in mine construction. The construction of the shaft passing over the drift-sand layer is very difficult. Traditional construction method faces many problems such as long construction period, high construction cost, poor working environment, and uncontrollabi...
Saved in:
| Main Authors: | Xicai Gao, Xinyu Wang, Xiangdong Liu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2018-01-01
|
| Series: | Advances in Materials Science and Engineering |
| Online Access: | http://dx.doi.org/10.1155/2018/2797419 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Experimental Study on Sonic Vibration Grouting in Fine Silty Sand Layer
by: Yu Wang, et al.
Published: (2018-01-01) -
Permeability of the composite coal in the grouting section around the CBM drainage borehole in the coal mine
by: Lei Zhang, et al.
Published: (2025-08-01) -
Evaluation of liquefaction resistance in chemically grouted sand using cyclic triaxial tests
by: Khin Nyein Chan Kyaw, et al.
Published: (2025-09-01) -
Mechanical Model of Underground Shaft Coal Pocket and Deformation of Silo Wall in Coal Mines
by: Yongping Wu, et al.
Published: (2020-01-01) -
Casing running and solidifying bore by grouting in directional long borehole in coal mine
by: Yanjun FENG, et al.