A Model for Bus Crew Scheduling Problem with Multiple Duty Types
This paper presents an approach for solving the bus crew scheduling problem which considers early, day, and late duty modes with time shift and work intensity constraints. Furthermore, the constraint with the least crew number of a certain duty (e.g., day duty) has also been considered. An optimizat...
Saved in:
| Main Authors: | Mingming Chen, Huimin Niu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2012-01-01
|
| Series: | Discrete Dynamics in Nature and Society |
| Online Access: | http://dx.doi.org/10.1155/2012/649213 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Minimum Cost Flow-Based Integrated Model for Electric Vehicle and Crew Scheduling
by: Yindong Shen, et al.
Published: (2023-01-01) -
Electric Bus Scheduling Problem with Time Windows and Stochastic Travel Times
by: Vladyslav Kost, et al.
Published: (2025-04-01) -
Service Restoration in Distribution Networks by Optimal Scheduling of Repair Crew and Mobile Power Sources
by: Qasem Asadi, et al.
Published: (2024-03-01) -
Optimal Crew Scheduling in an Intensive Care Unit: A Case Study in a University Hospital
by: Müfide Narlı, et al.
Published: (2025-03-01) -
Jumping Ship Crew In Cruise Ship Crew Recruitment At PT. CWT
by: Nabila Nurul Ikhlas, et al.
Published: (2024-11-01)