Changing the load of a arrow crane while carrying out loading and unloading works
The stability of self-propelled jib cranes is a key task in the process of their operation. The developed calculation scheme of the arrow self-propelled crane and the restrictions imposed on its movement in time and space, allowed to obtain mathematical dependence of the trajectory of the center of...
Saved in:
| Main Authors: | Sladkova L.A, Krylov V.V, Gorelova M.V. |
|---|---|
| Format: | Article |
| Language: | deu |
| Published: |
Academician I.G. Petrovskii Bryansk State University
2020-06-01
|
| Series: | Научно-технический вестник Брянского государственного университета |
| Subjects: | |
| Online Access: | http://ntv-brgu.ru/wp-content/arhiv/2020-N2/2020-02-12.PDF |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Theoretical justification and modeling of crane lifting device
by: Sladkova L.A., et al.
Published: (2020-09-01) -
Fish Arrow Injuries to the Extremities: A Case Series
by: P Umar Farooq Baba, et al.
Published: (2024-06-01) -
Experimental studies of load vibrations when moving the DEC-251 loading crane
by: Korytov M.S., et al.
Published: (2021-09-01) -
CHANGES JUSTIFICATION IN A CALCULATING METHOD OF LOAD STABILITY OF AUTOMOTIVE HOISTING CRANES AND AUTOMOTIVE MANIPULATOR CRANES BASED ON THE NORMATIVE DOCUMENTS ANALYSIS
by: K. G. Pugin
Published: (2020-07-01) -
Simulation of forces in the supports of machines of the main technological purpose on the example of a fully mobile crane
by: Sladkova L.A., et al.
Published: (2019-12-01)