Changing the load of a arrow crane while carrying out loading and unloading works

The stability of self-propelled jib cranes is a key task in the process of their operation. The developed calculation scheme of the arrow self-propelled crane and the restrictions imposed on its movement in time and space, allowed to obtain mathematical dependence of the trajectory of the center of...

Full description

Saved in:
Bibliographic Details
Main Authors: Sladkova L.A, Krylov V.V, Gorelova M.V.
Format: Article
Language:deu
Published: Academician I.G. Petrovskii Bryansk State University 2020-06-01
Series:Научно-технический вестник Брянского государственного университета
Subjects:
Online Access:http://ntv-brgu.ru/wp-content/arhiv/2020-N2/2020-02-12.PDF
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850248628053999616
author Sladkova L.A
Krylov V.V
Gorelova M.V.
author_facet Sladkova L.A
Krylov V.V
Gorelova M.V.
author_sort Sladkova L.A
collection DOAJ
description The stability of self-propelled jib cranes is a key task in the process of their operation. The developed calculation scheme of the arrow self-propelled crane and the restrictions imposed on its movement in time and space, allowed to obtain mathematical dependence of the trajectory of the center of gravity of the arrow, a change in the speed of its movement at the arbitrary turn of the arrow, as well as cinematic and energy characteristics of the movement of cargo when combining operations during the operation of the crane. The combination of lifting and lowering cargo and a turn to the unloading place helps to increase productivity during the work of self-propelled jib cranes. Moreover, the full energy of the system (crane structure) depends not only on the position of the center of gravity of the arrow and cargo, but also on the angle of the arrow to the horizon. Moreover, the amount of full energy of the system is directly proportional to the angle of rotation in vertical and horizontal planes. The resulting theoretical dependence studies allow to determine the energy spent on lifting and lowering the load and the trajectory of its movement within the change of the angle of the arrow in the vertical plane.
format Article
id doaj-art-157f2c0a4c1245eeac5dbcb98030da5c
institution OA Journals
issn 2413-9920
language deu
publishDate 2020-06-01
publisher Academician I.G. Petrovskii Bryansk State University
record_format Article
series Научно-технический вестник Брянского государственного университета
spelling doaj-art-157f2c0a4c1245eeac5dbcb98030da5c2025-08-20T01:58:41ZdeuAcademician I.G. Petrovskii Bryansk State UniversityНаучно-технический вестник Брянского государственного университета2413-99202020-06-016231131710.22281/2413-9920-2020-06-02-311-317Changing the load of a arrow crane while carrying out loading and unloading worksSladkova L.A0Krylov V.V1Gorelova M.V.2Russian University of TransportRussian University of TransportRussian University of TransportThe stability of self-propelled jib cranes is a key task in the process of their operation. The developed calculation scheme of the arrow self-propelled crane and the restrictions imposed on its movement in time and space, allowed to obtain mathematical dependence of the trajectory of the center of gravity of the arrow, a change in the speed of its movement at the arbitrary turn of the arrow, as well as cinematic and energy characteristics of the movement of cargo when combining operations during the operation of the crane. The combination of lifting and lowering cargo and a turn to the unloading place helps to increase productivity during the work of self-propelled jib cranes. Moreover, the full energy of the system (crane structure) depends not only on the position of the center of gravity of the arrow and cargo, but also on the angle of the arrow to the horizon. Moreover, the amount of full energy of the system is directly proportional to the angle of rotation in vertical and horizontal planes. The resulting theoretical dependence studies allow to determine the energy spent on lifting and lowering the load and the trajectory of its movement within the change of the angle of the arrow in the vertical plane.http://ntv-brgu.ru/wp-content/arhiv/2020-N2/2020-02-12.PDFloadarrow cranestabilitytrajectory
spellingShingle Sladkova L.A
Krylov V.V
Gorelova M.V.
Changing the load of a arrow crane while carrying out loading and unloading works
Научно-технический вестник Брянского государственного университета
load
arrow crane
stability
trajectory
title Changing the load of a arrow crane while carrying out loading and unloading works
title_full Changing the load of a arrow crane while carrying out loading and unloading works
title_fullStr Changing the load of a arrow crane while carrying out loading and unloading works
title_full_unstemmed Changing the load of a arrow crane while carrying out loading and unloading works
title_short Changing the load of a arrow crane while carrying out loading and unloading works
title_sort changing the load of a arrow crane while carrying out loading and unloading works
topic load
arrow crane
stability
trajectory
url http://ntv-brgu.ru/wp-content/arhiv/2020-N2/2020-02-12.PDF
work_keys_str_mv AT sladkovala changingtheloadofaarrowcranewhilecarryingoutloadingandunloadingworks
AT krylovvv changingtheloadofaarrowcranewhilecarryingoutloadingandunloadingworks
AT gorelovamv changingtheloadofaarrowcranewhilecarryingoutloadingandunloadingworks