Optimization of the Production Process using the Theory of Constraints (TOC) Method based on Drum-Buffer-Rope (DBR) Improvements
One footwear manufacturing company located in Surabaya has experienced an increase in production demand for both women's and men's sandals in recent years. The main issue faced by the company is the presence of bottlenecks at specific workstations due to unbalanced capacity, which disrupts...
Saved in:
| Main Authors: | Destiara Nabila Widyarsa, Rr. Rochmoeljati |
|---|---|
| Format: | Article |
| Language: | Indonesian |
| Published: |
Islamic University of Indragiri
2025-07-01
|
| Series: | Sistemasi: Jurnal Sistem Informasi |
| Subjects: | |
| Online Access: | https://sistemasi.ftik.unisi.ac.id/index.php/stmsi/article/view/5292 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Wire rope mis-wrap due to wire rope “cut-in” on LEBUS drums
by: Shuichi NAKAYAMA, et al.
Published: (2025-03-01) -
Do OPT à Teoria das Restrições: avanços e mitos From the OPT to the Theory of Constraints: advances and myths
by: Fernando Bernardi de Souza
Published: (2005-08-01) -
Optimization of Ground Coffee Production Capacity using the Theory of Constraints at PT. XYZ
by: Minhajun Ni’am, et al.
Published: (2025-07-01) -
Multi-Objective Optimization Method for High-Efficiency and Low-Consumption Wire Rope Greasing Process
by: Fan Zhou, et al.
Published: (2025-03-01) -
Formation of the strategy for restoring the rope system of the mobile transport and reloading rope complex during operation
by: Lagerev I.A., et al.
Published: (2020-06-01)