Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi Arabia
Evaluating risks is crucial for the smooth execution of pipeline projects. In Saudi Arabia, pipeline building projects frequently experience delays and cost overruns. This study tries to identify these risk factors. Thus, risk factors were collected from the literature and presented to four experts...
Saved in:
| Main Authors: | Khalid Al-Gahtani, Maan Shafaay, Omar Ahmed, Marwan Alawshan, Naif Alsanabani, Saad Aljadhai |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2023-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2023/9497451 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Building Information Modeling Impact on Cost Overrun Risk Factors and Interrelationships
by: Aljawharah A. Alnaser, et al.
Published: (2024-11-01) -
Hybrid Methods for Selecting Precast Concrete Suppliers Based on Factory Capacity
by: Mohammed I. Aldokhi, et al.
Published: (2025-07-01) -
An Examination on Project Cost Overruns in Project Management: A Study of S3 Project at Kanshanshi Mine
by: Kapangu Chola, et al.
Published: (2025-04-01) -
Overall Cost Overrun Estimate in Residential Projects: A Hybrid Dynamics Approach
by: Ghada Taha, et al.
Published: (2022-01-01) -
ANN prediction model of final construction cost at an early stage
by: Khalid S. Al-Gahtani, et al.
Published: (2025-03-01)