Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi Arabia

Evaluating risks is crucial for the smooth execution of pipeline projects. In Saudi Arabia, pipeline building projects frequently experience delays and cost overruns. This study tries to identify these risk factors. Thus, risk factors were collected from the literature and presented to four experts...

Full description

Saved in:
Bibliographic Details
Main Authors: Khalid Al-Gahtani, Maan Shafaay, Omar Ahmed, Marwan Alawshan, Naif Alsanabani, Saad Aljadhai
Format: Article
Language:English
Published: Wiley 2023-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2023/9497451
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849304355201613824
author Khalid Al-Gahtani
Maan Shafaay
Omar Ahmed
Marwan Alawshan
Naif Alsanabani
Saad Aljadhai
author_facet Khalid Al-Gahtani
Maan Shafaay
Omar Ahmed
Marwan Alawshan
Naif Alsanabani
Saad Aljadhai
author_sort Khalid Al-Gahtani
collection DOAJ
description Evaluating risks is crucial for the smooth execution of pipeline projects. In Saudi Arabia, pipeline building projects frequently experience delays and cost overruns. This study tries to identify these risk factors. Thus, risk factors were collected from the literature and presented to four experts to identify the 26 most common factors for pipeline construction in Saudi Arabia. The risk factors were then assessed using a questionnaire to measure the degree of impact of the 26 factors by 135 participants. Partial least square structure equation model (PLS-SEM) and relative importance index (RII) methods were utilized to rank the significant factors after performing the reliability and discriminant validity of the questionnaire data. The findings show that the top five factors based on PLS-SEM were discrepancy between implementation requirements and specifications, financial failure/bankruptcy, poor pipeline material quality, supplying invalid materials, and weak ability to identify and monitor the threats. The ranking of the factors using PLS-SEM is different in the RII method. This difference is due to applying the Cronbach’s α formula in the two methods. The PLS-SEM computes the coefficients of the groups, while the RII computes the coefficients for all factors. The study results can assist pipeline project managers in identifying and ranking risk variables to efficiently utilize the limited financial and human resources available for the risk management.
format Article
id doaj-art-1116bf1b917b4ba2b7ef79cd591c9278
institution Kabale University
issn 1687-8094
language English
publishDate 2023-01-01
publisher Wiley
record_format Article
series Advances in Civil Engineering
spelling doaj-art-1116bf1b917b4ba2b7ef79cd591c92782025-08-20T03:55:45ZengWileyAdvances in Civil Engineering1687-80942023-01-01202310.1155/2023/9497451Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi ArabiaKhalid Al-Gahtani0Maan Shafaay1Omar Ahmed2Marwan Alawshan3Naif Alsanabani4Saad Aljadhai5Department of Civil EngineeringDepartment of Civil EngineeringDepartment of Civil EngineeringDepartment of Civil EngineeringDepartment of Civil EngineeringDepartment of Civil EngineeringEvaluating risks is crucial for the smooth execution of pipeline projects. In Saudi Arabia, pipeline building projects frequently experience delays and cost overruns. This study tries to identify these risk factors. Thus, risk factors were collected from the literature and presented to four experts to identify the 26 most common factors for pipeline construction in Saudi Arabia. The risk factors were then assessed using a questionnaire to measure the degree of impact of the 26 factors by 135 participants. Partial least square structure equation model (PLS-SEM) and relative importance index (RII) methods were utilized to rank the significant factors after performing the reliability and discriminant validity of the questionnaire data. The findings show that the top five factors based on PLS-SEM were discrepancy between implementation requirements and specifications, financial failure/bankruptcy, poor pipeline material quality, supplying invalid materials, and weak ability to identify and monitor the threats. The ranking of the factors using PLS-SEM is different in the RII method. This difference is due to applying the Cronbach’s α formula in the two methods. The PLS-SEM computes the coefficients of the groups, while the RII computes the coefficients for all factors. The study results can assist pipeline project managers in identifying and ranking risk variables to efficiently utilize the limited financial and human resources available for the risk management.http://dx.doi.org/10.1155/2023/9497451
spellingShingle Khalid Al-Gahtani
Maan Shafaay
Omar Ahmed
Marwan Alawshan
Naif Alsanabani
Saad Aljadhai
Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi Arabia
Advances in Civil Engineering
title Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi Arabia
title_full Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi Arabia
title_fullStr Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi Arabia
title_full_unstemmed Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi Arabia
title_short Risk Factors for Time and Cost Overruns of Pipeline Projects in Saudi Arabia
title_sort risk factors for time and cost overruns of pipeline projects in saudi arabia
url http://dx.doi.org/10.1155/2023/9497451
work_keys_str_mv AT khalidalgahtani riskfactorsfortimeandcostoverrunsofpipelineprojectsinsaudiarabia
AT maanshafaay riskfactorsfortimeandcostoverrunsofpipelineprojectsinsaudiarabia
AT omarahmed riskfactorsfortimeandcostoverrunsofpipelineprojectsinsaudiarabia
AT marwanalawshan riskfactorsfortimeandcostoverrunsofpipelineprojectsinsaudiarabia
AT naifalsanabani riskfactorsfortimeandcostoverrunsofpipelineprojectsinsaudiarabia
AT saadaljadhai riskfactorsfortimeandcostoverrunsofpipelineprojectsinsaudiarabia