ON REPLACEMENT PIPE TUBING IN GAS WELLS FIELDS IN THE LATEST, THE FINAL STAGE OF PRODUCTION IN ABNORMALLY LOW FIELD PRESSURES
The possibility of using reinforced polyethylene pipes for the replacement of tubing to a smaller diameter due to technological necessity in gas wells in the final stages of operation is offered in this article. We proposed the new design of the end connections for reinforced polyethylene pipes. For...
Saved in:
| Main Authors: | Sergey Anatol’evich Parosochenko, Yulianna Olegovna Sizova, Konstantin Nikolaevich Denyak |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
North Caucasus Federal University
2022-05-01
|
| Series: | Вестник Северо-Кавказского федерального университета |
| Subjects: | |
| Online Access: | https://vestnikskfu.elpub.ru/jour/article/view/1974 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
EFFICIENCY OF FOAM-FORMERS USED FOR DRIVING WATER OUT OF WELLS AT LATER STAGES OF FIELD DEVELOPMENT
by: Ramiz A. Gasumov
Published: (2022-05-01) -
Оптимизация живучести энергетических комплексов
by: Igor Bychkov, et al.
Published: (2025-06-01) -
СOMBINED LABORATORY ABRASION TEST OF WORKING TOOLS MATERIALS
by: S. A. Sidorov, et al.
Published: (2016-12-01) -
DISADVANTAGES OF THE SYSTEM OF TAXATION OF SUBSOIL USE AND WAYS TO IMPROVE IT
by: S. Mamaev
Published: (2016-01-01) -
Extreme forecasting for universal control fuel pump and gas turbine engine in service obtaining for a long time trials
by: Elena V. Shendaleva
Published: (2017-08-01)