Short Term Air Conditioning System Configuration Scheme for Subway Station in Hot Summer and Warm Winter Areas

[Objective] There are significant differences between the air conditioning system loads of subway stations in short term and long term. In order to avoid serious operation energy waste, the air conditioning system configuration mainly adopts variable frequency scheme or phased configuration scheme,...

Full description

Saved in:
Bibliographic Details
Main Authors: YANG Zhuo, WU Tongling, LI Xiaofeng
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2025-04-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.015.html
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850040304358391808
author YANG Zhuo
WU Tongling
LI Xiaofeng
author_facet YANG Zhuo
WU Tongling
LI Xiaofeng
author_sort YANG Zhuo
collection DOAJ
description [Objective] There are significant differences between the air conditioning system loads of subway stations in short term and long term. In order to avoid serious operation energy waste, the air conditioning system configuration mainly adopts variable frequency scheme or phased configuration scheme, but systematic quantitative research are still required. Therefore, it is necessary to study the air conditioning system configuration scheme for subway station operations in the short term. [Method] Taking a typical subway station in a city with hot summers and warm winters as an example, a load and energy consumption model that can analyze the superposed impact of actual engineering problems is established, and the model is corrected using actual test data. Two commonly used configuration schemes for air conditioning systems in subway station short-term operation are compared, and the operating energy consumption of the two schemes and the reasons for their differences are calculated and analyzed. [Result & Conclusion] Under ideal working conditions, i.e. the installed capacity of the equipment meets the actual load requirements and the air conditioning system is operated in variable frequency, scheme Ⅱ (phased configuration scheme) could save 19.7% energy compared to scheme Ⅰ (variable frequency scheme) ; under the most unfavorable working conditions, i.e. the installed capacity of the equipment is 50% greater than the actual load demand and the equipment frequency is not fully variable in operation, Scheme Ⅱ could save 42.1% energy compared with Scheme Ⅰ. When adopting Scheme Ⅰ, the installed capacity of the equipment should be closer to the actual load, and reasonable self-control strategies and variable frequency equipment should be adopted to ensure that the air conditioning system can be adjusted according to the actual load. When adopting Scheme Ⅱ, the resistance of the water and wind systems should be carefully calculated in the design.
format Article
id doaj-art-101b197e968e484da5f6eaeffd8e9895
institution DOAJ
issn 1007-869X
language zho
publishDate 2025-04-01
publisher Urban Mass Transit Magazine Press
record_format Article
series Chengshi guidao jiaotong yanjiu
spelling doaj-art-101b197e968e484da5f6eaeffd8e98952025-08-20T02:56:08ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2025-04-01284788310.16037/j.1007-869x.2025.04.015Short Term Air Conditioning System Configuration Scheme for Subway Station in Hot Summer and Warm Winter AreasYANG Zhuo0WU Tongling1LI Xiaofeng2Beijing Tsinghua Tongheng Urban Planning & Design Institute Co., Ltd., 100085, Beijing, ChinaBeijing Tsinghua Tongheng Urban Planning & Design Institute Co., Ltd., 100085, Beijing, ChinaSchool of Architecture, Tsinghua University,100084, Beijing, China[Objective] There are significant differences between the air conditioning system loads of subway stations in short term and long term. In order to avoid serious operation energy waste, the air conditioning system configuration mainly adopts variable frequency scheme or phased configuration scheme, but systematic quantitative research are still required. Therefore, it is necessary to study the air conditioning system configuration scheme for subway station operations in the short term. [Method] Taking a typical subway station in a city with hot summers and warm winters as an example, a load and energy consumption model that can analyze the superposed impact of actual engineering problems is established, and the model is corrected using actual test data. Two commonly used configuration schemes for air conditioning systems in subway station short-term operation are compared, and the operating energy consumption of the two schemes and the reasons for their differences are calculated and analyzed. [Result & Conclusion] Under ideal working conditions, i.e. the installed capacity of the equipment meets the actual load requirements and the air conditioning system is operated in variable frequency, scheme Ⅱ (phased configuration scheme) could save 19.7% energy compared to scheme Ⅰ (variable frequency scheme) ; under the most unfavorable working conditions, i.e. the installed capacity of the equipment is 50% greater than the actual load demand and the equipment frequency is not fully variable in operation, Scheme Ⅱ could save 42.1% energy compared with Scheme Ⅰ. When adopting Scheme Ⅰ, the installed capacity of the equipment should be closer to the actual load, and reasonable self-control strategies and variable frequency equipment should be adopted to ensure that the air conditioning system can be adjusted according to the actual load. When adopting Scheme Ⅱ, the resistance of the water and wind systems should be carefully calculated in the design.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.015.htmlsubway stationair-conditioning systemenergy conservation
spellingShingle YANG Zhuo
WU Tongling
LI Xiaofeng
Short Term Air Conditioning System Configuration Scheme for Subway Station in Hot Summer and Warm Winter Areas
Chengshi guidao jiaotong yanjiu
subway station
air-conditioning system
energy conservation
title Short Term Air Conditioning System Configuration Scheme for Subway Station in Hot Summer and Warm Winter Areas
title_full Short Term Air Conditioning System Configuration Scheme for Subway Station in Hot Summer and Warm Winter Areas
title_fullStr Short Term Air Conditioning System Configuration Scheme for Subway Station in Hot Summer and Warm Winter Areas
title_full_unstemmed Short Term Air Conditioning System Configuration Scheme for Subway Station in Hot Summer and Warm Winter Areas
title_short Short Term Air Conditioning System Configuration Scheme for Subway Station in Hot Summer and Warm Winter Areas
title_sort short term air conditioning system configuration scheme for subway station in hot summer and warm winter areas
topic subway station
air-conditioning system
energy conservation
url https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.04.015.html
work_keys_str_mv AT yangzhuo shorttermairconditioningsystemconfigurationschemeforsubwaystationinhotsummerandwarmwinterareas
AT wutongling shorttermairconditioningsystemconfigurationschemeforsubwaystationinhotsummerandwarmwinterareas
AT lixiaofeng shorttermairconditioningsystemconfigurationschemeforsubwaystationinhotsummerandwarmwinterareas