Fuzzy Partitioned Multi-objective Risk Framework Based Operational Risk Assessment of Cascading Failure for Power Grid
On the basis of analyzing the difference between the long-term evolution process and the short-term evolution process of the power grid, the concept of power grid cascading failure operation risk is proposed, the relationship between the long-term risk of cascading failure and operation risk is quan...
Saved in:
| Main Authors: | Shi MO, Qiushi XU, Zijing LU, Zishou LI, Hongsheng ZHAO, Li QIAO, Chao LUO |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
State Grid Energy Research Institute
2024-02-01
|
| Series: | Zhongguo dianli |
| Subjects: | |
| Online Access: | https://www.electricpower.com.cn/CN/10.11930/j.issn.1004-9649.202311114 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Finite beaming effect on QED cascades
by: Suo Tang
Published: (2024-12-01) -
A Monte Carlo Simulation study on the design and optimization of collimators for non-collinear cascade gamma-ray correlation emissions in medical imaging
by: Leonid Leopold Nkuba, et al.
Published: (2025-03-01) -
Reliability evaluation method of distributed generation in rural power grid based on network partition
by: KONG Fanfang, et al.
Published: (2025-05-01) -
Multi-Domain Modeling of Free-Running Harmonic Frequency Comb Formation in Terahertz Quantum Cascade Lasers
by: Johannes Popp, et al.
Published: (2024-01-01) -
THE ASSESSMENT OF RISKS THAT THREATEN A PROJECT
by: CRISTINA MARIA STOICA, et al.
Published: (2012-05-01)