Polynomial estimation method for PN sequence based on reliability accumulation
The issues of insufficient efficiency and poor error-tolerance of current high-order polynomial estimation me-thods under error conditions were studied.By combining the iterative berlekamp-massey(BM)algorithm in GF(2)and the improved Chase algorithm,a novel algorithm based on reliability accumulatio...
Saved in:
Main Authors: | Song CHEN, Kai-zhi HUANG, Hua ZHAO |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Journal on Communications
2012-09-01
|
Series: | Tongxin xuebao |
Subjects: | |
Online Access: | http://www.joconline.com.cn/zh/article/doi/1000-436X(2012)09-0125-07/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
On fundamental sets over a finite field
by: Yousef Abbas, et al.
Published: (1985-01-01) -
Method of fast construction of M-sequence feedback functions with polynomial representation
by: Jie GUAN, et al.
Published: (2018-04-01) -
Primitive polynomials and word oriented linear feedback shift registers
by: ZENG Guang, et al.
Published: (2009-01-01) -
Validity and reliability of the Malay language Perception Towards Smoking Questionnaire (BM-PTSQ) among
secondary school adolescents: Further validation using Confirmatory Factor Analysis
by: Kuang Hock Lim, et al.
Published: (2024-01-01) -
MECHANICAL STRUCTURAL RELIABILITY ANALYSIS BASED ON POLYNOMIAL CHAOS EXPANSIONS
by: WANG ZhiMing, et al.
Published: (2022-01-01)