The slip surface mechanism of delayed failure of the Brumadinho tailings dam in 2019
Abstract The 2019 Feijão dam failure in Brumadinho, Brazil, claimed 270 lives and caused enormous environmental damage. A special feature of this failure was that it took place three years after the tailings disposal was terminated, which should have allowed sufficient time for the material to conso...
Saved in:
| Main Authors: | Fangyuan Zhu, Wangcheng Zhang, Alexander M. Puzrin |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Nature Portfolio
2024-01-01
|
| Series: | Communications Earth & Environment |
| Online Access: | https://doi.org/10.1038/s43247-023-01086-9 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Psychiatric drugs dispensing trends in the affected population following Brumadinho dam failure
by: Marcelo Farah Dell'Aringa, et al.
Published: (2025-05-01) -
From disaster to disease: Dengue outbreaks after mining dam failures in Mariana and Brumadinho, Brazil
by: Bianca Alves Almeida Machado, et al.
Published: (2025-06-01) -
Microbial Indicators Show the Rehabilitation Flow of Soil Microbiota After the Brumadinho Dam Collapse
by: Paulo Wilson Goulart, et al.
Published: (2025-02-01) -
Rates and Causes of Tailings Dam Failures
by: Timothy D. Stark, et al.
Published: (2022-01-01) -
Spatial Evolution Analysis of Tailings Flow from Tailings Dam Failure Based on MacCormack-TVD
by: Lei Ma, et al.
Published: (2025-02-01)