Stability Impact Analysis of Main Construction of High-Slope PBA Concealed Excavation Metro Station
To address the issues of significant deformation and insufficient stability during the construction of a high-slope metro station, a study was conducted using indoor tests, numerical simulations, and on-site monitoring, based on a metro station in Xi’an City. Finite element analysis software was use...
Saved in:
| Main Authors: | Tieyin Zhang, Lei Qiang, Xinyu Qian, Guanhua Cui, Peilong Yuan, Qiang Wang, Kunlong Zheng |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2025-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/adce/2371680 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Impact of Lateral Pipe Curtains on Land Subsidence in PBA Metro Station
by: HE Zhiwei, et al.
Published: (2025-06-01) -
PBA 2024
by: Serge Rudaz
Published: (2024-12-01) -
Numerical Simulation of Slope Excavation and Stability Under Earthquakes in Cataclastic Loose Rock Mass of Hydropower Station on Lancang River
by: Wenjing Liu, et al.
Published: (2025-07-01) -
Exploration and Practice of New Underground Excavation Method for Large Span Metro Station in Urban Area
by: WANG Xiang, et al.
Published: (2025-07-01) -
Experimental Study on Structural Form and Excavation Model of Urban Metro Cross Transfer Station with Super Large Cross Section and Shallow Excavation
by: Zhi Lin, et al.
Published: (2020-01-01)