Fin des infrastructures, mobilités et nouvelles dynamiques territoriales : le cas de la fermeture de la centrale électronucléaire Superphénix (Isère, France).
This article analyzes the closure of the Superphénix fast breeder plant in Creys-Malville, decided in 1997 after 11 years of operation. The Superphénix plant is the only case of a complete closure of a full-scale nuclear power plant in France. It provides information on post-closure territorial traj...
Saved in:
| Main Authors: | Romain Garcier, Paul-Etienne Pini |
|---|---|
| Format: | Article |
| Language: | fra |
| Published: |
Éditions en environnement VertigO
2021-10-01
|
| Series: | VertigO |
| Subjects: | |
| Online Access: | https://journals.openedition.org/vertigo/33293 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Decommissioning of the BN-350 Fast Neutron Reactor: History Review and Current Status
by: Nurzhan Mukhamedov, et al.
Published: (2025-07-01) -
Evaluation of the decommissioning fund for a nuclear power plant in Brazil
by: Deiglys Borges Monteiro, et al.
Published: (2022-12-01) -
Principal provisions of the decommissioning concept for the WWR-M research reactor
by: Yu. M. Lobach, et al.
Published: (2021-12-01) -
Risks to be considered in Nuclear Reactor Decommissioning Projects in Brazil: Tecnicas do processo de avaliação de gestão de risco para o descomissionamento de reatores nucleares
by: Alvaro Brito Caldas Neto
Published: (2022-12-01) -
DETAILS OF OPERATIONS PERFORMED BY THE REMOTE CONTROL ROBOT (CONCEPT) TO THE HORIZONTAL FUEL CHANNEL DURING DECOMMISSIONING PHASE OF NUCLEAR REACTOR CALANDRIA STRUCTURE. PART I: OUTSIDE OPERATIONS
by: Constantin POPESCU, et al.
Published: (2017-05-01)