FOUNDATION OF THE NEW RAILWAY BRIDGE OVER THE NOSICKÁ DAM ON THE RIVER VÁH
The new railway bridge over the Nosická dam is a part of the complex modernization of the railway corridor from Púchov to Žilina. Our company participated on the project using a wide variety of special foundation techniques on artificial islands for piers P6, P5, P4 and P3 and the pillar foundations...
Saved in:
| Main Author: | Maroš Zaťko |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Czech Technical University in Prague
2021-01-01
|
| Series: | Acta Polytechnica CTU Proceedings |
| Subjects: | |
| Online Access: | https://ojs.cvut.cz/ojs/index.php/APP/article/view/7036 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Investigation of Implantable Capsule Grouting Technology and Its Bearing Characteristics in Soft Soil Areas
by: Xinran Li, et al.
Published: (2025-07-01) -
Optimization Analysis of Isolation Pile Parameters for Rail Transit Foundation Pits near High-speed Railway Pile-slab Subgrade
by: HE Shuqi, et al.
Published: (2025-06-01) -
Impact Numerical Simulation of Steel Sheet Pile Foundation Pit Excavation on Underlying Metro Tunnels
by: HAN Yufeng, et al.
Published: (2025-07-01) -
Study on the Impact of Spontaneous Combustion of Coal Gangue on Photovoltaic Pile Foundations and Surface Structures
by: Wenjin Zheng, et al.
Published: (2025-04-01) -
Performance Optimization and Field Validation of Post-Grouting Geopolymer Materials for Pile Foundations: Microstructural Insights and Environmental Durability
by: Chongchong He, et al.
Published: (2025-03-01)