Modelling and Metaheuristic for Gantry Crane Scheduling and Storage Space Allocation Problem in Railway Container Terminals
The gantry crane scheduling and storage space allocation problem in the main containers yard of railway container terminal is studied. A mixed integer programming model which comprehensively considers the handling procedures, noncrossing constraints, the safety margin and traveling time of gantry cr...
Saved in:
Main Authors: | Ming Zeng, Wenming Cheng, Peng Guo |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2017-01-01
|
Series: | Discrete Dynamics in Nature and Society |
Online Access: | http://dx.doi.org/10.1155/2017/9025482 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization Approach for Yard Crane Scheduling Problem with Uncertain Parameters in Container Terminals
by: Wenqian Liu, et al.
Published: (2021-01-01) -
STUDY ON PREDICTION DEFLECTION AT GIRDER MIDSPAN OF LARGE TONNAGE RIGID CONNECTION LEGS GANTRY CRANE BASED ON ENERGY METHOD
by: ZHANG DaPeng, et al.
Published: (2015-01-01) -
EXPERIMENTAL STUDIES REGARDING THE RISK-FREE WORK OF THE GANTRY CRANES
by: GHEORGHE N. RADU, et al.
Published: (2015-12-01) -
THEORETICAL RESEARCH REGARDING THE RISK-FREE WORK OF THE GANTRY CRANES
by: GHEORGHE N. RADU, et al.
Published: (2015-12-01) -
STUDY ON PROBABILISTIC SAFETY ASSESSMENT FOR BOX GIRDER OF BRIDGE AND GANTRY CRANE
by: LUO YouHong, et al.
Published: (2017-01-01)