Robust Optimization for Integrated Construction Scheduling and Multiscale Resource Allocation
This research investigates an integrated problem of construction scheduling and resource allocation. Inspired by complex construction practices, multi-time scale resources are considered for different length of terms, such as permanent staff and temporary workers. Differing from the common stochasti...
Saved in:
| Main Authors: | Qian Li, Sha Tao, Heap-Yih Chong, Zhijie Sasha Dong |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2018-01-01
|
| Series: | Complexity |
| Online Access: | http://dx.doi.org/10.1155/2018/2697985 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
BIM and AI Integration for Dynamic Schedule Management: A Practical Framework and Case Study
by: Heap-Yih Chong, et al.
Published: (2025-07-01) -
Mapping BIM Uses for Risk Mitigation in International Construction Projects
by: Tsenguun Ganbat, et al.
Published: (2020-01-01) -
Joint scheduling and resource allocation based on reinforcement learning in integrated access and backhaul networks
by: Joeun Kim, et al.
Published: (2025-06-01) -
Flexible beam scheduling and resource allocation strategies for satellite Internet of things
by: LI Fulin, et al.
Published: (2025-03-01) -
Optimizing Competency-Based Human Resource Allocation in Construction Project Scheduling: A Multi-Objective Meta-Heuristic Approach
by: Bahman Shojaei, et al.
Published: (2024-09-01)