A vibration damping optimization algorithm to solve flexible job shop scheduling problems with reverse flows
The Flexible Job shop Scheduling Problem (FJSP), as a Production Scheduling Problem (PSP), is generally an extension of the Job shop Scheduling Problem (JSP). In this paper, the FJSP with reverse flow consisting of two flows of jobs (direct and reverse) at each stage is studied; the first flow initi...
Saved in:
Main Authors: | Esmaeil Mehdizadeh, Fatemeh Soleimaninia |
---|---|
Format: | Article |
Language: | English |
Published: |
Ayandegan Institute of Higher Education,
2023-12-01
|
Series: | International Journal of Research in Industrial Engineering |
Subjects: | |
Online Access: | https://www.riejournal.com/article_184194_bfa0b6b040331c995eac00dd40b5f6bc.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Preference learning based deep reinforcement learning for flexible job shop scheduling problem
by: Xinning Liu, et al.
Published: (2025-01-01) -
Improving the job shop scheduling algorithm to minimize total penalty costs considering maintenance activity
by: Puryani Puryani, et al.
Published: (2024-12-01) -
MILP Modeling and Optimization of Multi-Objective Three-Stage Flexible Job Shop Scheduling Problem With Assembly and AGV Transportation
by: Shiming Yang, et al.
Published: (2025-01-01) -
Presenting a model for solving lot-streaming hybrid flow shop scheduling problem by considering independent setup time and transportation time
by: Roja Ruhbakhsh, et al.
Published: (2023-09-01) -
Knowledge Graph-Enhanced Digital Twin Framework for Optimized Job Shop Scheduling in Smart Manufacturing
by: Nehal Tarek, et al.
Published: (2025-01-01)