A Study of Millisecond Blasting on High Bench at Barun Iron Ore Operation
To improve the productivity and efficient of modern large-scale open-cut mines, a number of technologies are developed and trialed, including new blasting equipment, larger blasting holes, high benches, air spacing, and short-delay blasting within holes. However, the relative blasting parameters nee...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Geofluids |
Online Access: | http://dx.doi.org/10.1155/2021/3645438 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!