Research on the Time-Dependent Behavior of Uplift Piles in Structured Clay Foundations in Zhanjiang Formation

The structural clay of the Zhanjiang Formation exhibits significant thixotropy, and there are considerable differences in the ultimate bearing capacity of pulled-out piles under different resting times. Using the structural clay from the Zhanjiang Formation as the foundation, direct shear tests on t...

Full description

Saved in:
Bibliographic Details
Main Authors: Yonghui Yang, Tang Bin, Yinchuan Wang, Xingyun Huang, Zuyuan Yu
Format: Article
Language:English
Published: MDPI AG 2025-03-01
Series:Applied Sciences
Subjects:
Online Access:https://www.mdpi.com/2076-3417/15/7/3814
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1849738850155364352
author Yonghui Yang
Tang Bin
Yinchuan Wang
Xingyun Huang
Zuyuan Yu
author_facet Yonghui Yang
Tang Bin
Yinchuan Wang
Xingyun Huang
Zuyuan Yu
author_sort Yonghui Yang
collection DOAJ
description The structural clay of the Zhanjiang Formation exhibits significant thixotropy, and there are considerable differences in the ultimate bearing capacity of pulled-out piles under different resting times. Using the structural clay from the Zhanjiang Formation as the foundation, direct shear tests on the soil surrounding nine groups of model single piles of different sizes were conducted at various resting times, along with static pullout tests on the pile foundations. The results indicate that the cohesion and internal friction angle of the surrounding soil increase following a logarithmic function with increasing resting time; specifically, the growth rate is rapid in the early resting period and gradually slows down in the later period. A quantitative relationship describing the variation of cohesion and internal friction angle over time was established. The load–displacement curves for single piles at different resting times exhibit a distinct steep drop. The uplift single pile exhibits significant time-dependency, with the ultimate uplift bearing capacity increasing more rapidly in the early stages and gradually stabilizing in the later stages. Under different resting times, for each load level, the maximum side friction resistance of the pile gradually shifts to the middle and lower parts of the pile body, while the ultimate side friction resistance is evenly distributed along the lower part of the pile body, with the side friction resistance of the pile bearing the uplift load. Based on the quantitative relationship of the cohesion and internal friction angle of the surrounding soil around the pile varying with time, a predictive formula for the axial pullout ultimate bearing capacity of a single pile in the Zhanjiang Group structured clay foundation has been established. Using existing pile foundation projects, model experiments were designed to verify the validity of the formula; however, there is a lack of field-scale validation. The research findings can provide a reference for predicting the axial pullout ultimate bearing capacity of single piles in practical engineering applications.
format Article
id doaj-art-e5fe87cc98e54284b58dd4892bcdc915
institution DOAJ
issn 2076-3417
language English
publishDate 2025-03-01
publisher MDPI AG
record_format Article
series Applied Sciences
spelling doaj-art-e5fe87cc98e54284b58dd4892bcdc9152025-08-20T03:06:27ZengMDPI AGApplied Sciences2076-34172025-03-01157381410.3390/app15073814Research on the Time-Dependent Behavior of Uplift Piles in Structured Clay Foundations in Zhanjiang FormationYonghui Yang0Tang Bin1Yinchuan Wang2Xingyun Huang3Zuyuan Yu4Guangxi Key Laboratory of Geotechnical Mechanics and Engineering, Guilin University of Technology, Guilin 541004, ChinaGuangxi Key Laboratory of Geotechnical Mechanics and Engineering, Guilin University of Technology, Guilin 541004, ChinaGuangxi Key Laboratory of Geotechnical Mechanics and Engineering, Guilin University of Technology, Guilin 541004, ChinaGuangxi Key Laboratory of Geotechnical Mechanics and Engineering, Guilin University of Technology, Guilin 541004, ChinaGuangxi Key Laboratory of Geotechnical Mechanics and Engineering, Guilin University of Technology, Guilin 541004, ChinaThe structural clay of the Zhanjiang Formation exhibits significant thixotropy, and there are considerable differences in the ultimate bearing capacity of pulled-out piles under different resting times. Using the structural clay from the Zhanjiang Formation as the foundation, direct shear tests on the soil surrounding nine groups of model single piles of different sizes were conducted at various resting times, along with static pullout tests on the pile foundations. The results indicate that the cohesion and internal friction angle of the surrounding soil increase following a logarithmic function with increasing resting time; specifically, the growth rate is rapid in the early resting period and gradually slows down in the later period. A quantitative relationship describing the variation of cohesion and internal friction angle over time was established. The load–displacement curves for single piles at different resting times exhibit a distinct steep drop. The uplift single pile exhibits significant time-dependency, with the ultimate uplift bearing capacity increasing more rapidly in the early stages and gradually stabilizing in the later stages. Under different resting times, for each load level, the maximum side friction resistance of the pile gradually shifts to the middle and lower parts of the pile body, while the ultimate side friction resistance is evenly distributed along the lower part of the pile body, with the side friction resistance of the pile bearing the uplift load. Based on the quantitative relationship of the cohesion and internal friction angle of the surrounding soil around the pile varying with time, a predictive formula for the axial pullout ultimate bearing capacity of a single pile in the Zhanjiang Group structured clay foundation has been established. Using existing pile foundation projects, model experiments were designed to verify the validity of the formula; however, there is a lack of field-scale validation. The research findings can provide a reference for predicting the axial pullout ultimate bearing capacity of single piles in practical engineering applications.https://www.mdpi.com/2076-3417/15/7/3814Zhanjiang formation structural claythixotropyaging
spellingShingle Yonghui Yang
Tang Bin
Yinchuan Wang
Xingyun Huang
Zuyuan Yu
Research on the Time-Dependent Behavior of Uplift Piles in Structured Clay Foundations in Zhanjiang Formation
Applied Sciences
Zhanjiang formation structural clay
thixotropy
aging
title Research on the Time-Dependent Behavior of Uplift Piles in Structured Clay Foundations in Zhanjiang Formation
title_full Research on the Time-Dependent Behavior of Uplift Piles in Structured Clay Foundations in Zhanjiang Formation
title_fullStr Research on the Time-Dependent Behavior of Uplift Piles in Structured Clay Foundations in Zhanjiang Formation
title_full_unstemmed Research on the Time-Dependent Behavior of Uplift Piles in Structured Clay Foundations in Zhanjiang Formation
title_short Research on the Time-Dependent Behavior of Uplift Piles in Structured Clay Foundations in Zhanjiang Formation
title_sort research on the time dependent behavior of uplift piles in structured clay foundations in zhanjiang formation
topic Zhanjiang formation structural clay
thixotropy
aging
url https://www.mdpi.com/2076-3417/15/7/3814
work_keys_str_mv AT yonghuiyang researchonthetimedependentbehaviorofupliftpilesinstructuredclayfoundationsinzhanjiangformation
AT tangbin researchonthetimedependentbehaviorofupliftpilesinstructuredclayfoundationsinzhanjiangformation
AT yinchuanwang researchonthetimedependentbehaviorofupliftpilesinstructuredclayfoundationsinzhanjiangformation
AT xingyunhuang researchonthetimedependentbehaviorofupliftpilesinstructuredclayfoundationsinzhanjiangformation
AT zuyuanyu researchonthetimedependentbehaviorofupliftpilesinstructuredclayfoundationsinzhanjiangformation